YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Solar Energy Engineering
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Solar Energy Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analysis of the Use of Remote Sensing Measurements for Developing Wind Power Projects

    Source: Journal of Solar Energy Engineering:;2019:;volume( 141 ):;issue: 004::page 41005
    Author:
    Böhme, Gustavo S.
    ,
    Fadigas, Eliane A.
    ,
    Martinez, Julio R.
    ,
    Tassinari, Carlos E. M.
    DOI: 10.1115/1.4042547
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Micrositing wind flow modeling presents one of the most relevant uncertainties in the project of wind power plants. Studies in the area indicate that the average uncertainty related to this item varies between 2.4% and 8% of the annual energy production (AEP). The most efficient form to mitigate this uncertainty is to obtain additional measurements from the site. This can be achieved by installing met masts and by applying short-term remote sensing campaigns (LIDAR and SODAR). Ideally, measurement campaigns should have at least one complete year of data to capture seasonal changes in the local wind behavior and to increase the long-term representation of the sample. However, remote sensing is frequently performed in reduced periods of measurement, coming down to months or even weeks of campaign. The main contribution of this paper is to analyze whether short-term remote sensing measurements contribute to the development of wind power projects, given the associated uncertainties due to low representativeness of the reduced data sample. This study was performed using over 60 years of wind measurement data. Its main findings indicate that the contribution of short-term remote sensing campaigns vary depending on the complexity of the local terrain, and the respective uncertainty related to horizontal and vertical extrapolation of micrositing models. The results showed that in only 30% of the cases, a 3 month measurement campaign reduced the projects overall uncertainty. This number increases to 50% for a 6 month campaign and 90% for a 10 month campaign.
    • Download: (1.676Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Analysis of the Use of Remote Sensing Measurements for Developing Wind Power Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4255896
    Collections
    • Journal of Solar Energy Engineering

    Show full item record

    contributor authorBöhme, Gustavo S.
    contributor authorFadigas, Eliane A.
    contributor authorMartinez, Julio R.
    contributor authorTassinari, Carlos E. M.
    date accessioned2019-03-17T10:04:47Z
    date available2019-03-17T10:04:47Z
    date copyright2/19/2019 12:00:00 AM
    date issued2019
    identifier issn0199-6231
    identifier othersol_141_04_041005.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4255896
    description abstractMicrositing wind flow modeling presents one of the most relevant uncertainties in the project of wind power plants. Studies in the area indicate that the average uncertainty related to this item varies between 2.4% and 8% of the annual energy production (AEP). The most efficient form to mitigate this uncertainty is to obtain additional measurements from the site. This can be achieved by installing met masts and by applying short-term remote sensing campaigns (LIDAR and SODAR). Ideally, measurement campaigns should have at least one complete year of data to capture seasonal changes in the local wind behavior and to increase the long-term representation of the sample. However, remote sensing is frequently performed in reduced periods of measurement, coming down to months or even weeks of campaign. The main contribution of this paper is to analyze whether short-term remote sensing measurements contribute to the development of wind power projects, given the associated uncertainties due to low representativeness of the reduced data sample. This study was performed using over 60 years of wind measurement data. Its main findings indicate that the contribution of short-term remote sensing campaigns vary depending on the complexity of the local terrain, and the respective uncertainty related to horizontal and vertical extrapolation of micrositing models. The results showed that in only 30% of the cases, a 3 month measurement campaign reduced the projects overall uncertainty. This number increases to 50% for a 6 month campaign and 90% for a 10 month campaign.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleAnalysis of the Use of Remote Sensing Measurements for Developing Wind Power Projects
    typeJournal Paper
    journal volume141
    journal issue4
    journal titleJournal of Solar Energy Engineering
    identifier doi10.1115/1.4042547
    journal fristpage41005
    journal lastpage041005-7
    treeJournal of Solar Energy Engineering:;2019:;volume( 141 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian