YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    New Three-Part Model of Innovation Activity in Construction Companies

    Source: Journal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 005
    Author:
    Tugce Ercan
    DOI: 10.1061/(ASCE)CO.1943-7862.0001645
    Publisher: American Society of Civil Engineers
    Abstract: The development of a model to clarify the relationships among innovation activity (INVACT), collaboration level (CL), and technological capacity (TC) should contribute to better innovation management in construction companies. The main purpose of this study was to elucidate the relationships among CL, TC, and INVACT in construction companies. For the purpose four regression models were developed to clarify the moderating/mediating effects of TC on INVACT and CL in construction companies by using a moderated/mediated regression analysis. A questionnaire was used to collect data from 116 construction companies. The empirical results show that CL has a significant impact on INVACT which is mediated by TC. In contrast, the moderating effect of CL with TC on INVACT is considerably weak. In construction companies, CL has an indirect effect on INVACT. The proposed model serves as a starting point for better innovation-management models in construction companies. The primary contributions of this research are the development of a new moderator/mediation model for innovation management in construction, so a new theoretical framework and an emphasis that, in the construction industry, there is a strong need for new ways of thinking about innovation management.
    • Download: (290.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      New Three-Part Model of Innovation Activity in Construction Companies

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4254709
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTugce Ercan
    date accessioned2019-03-10T12:02:14Z
    date available2019-03-10T12:02:14Z
    date issued2019
    identifier other%28ASCE%29CO.1943-7862.0001645.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254709
    description abstractThe development of a model to clarify the relationships among innovation activity (INVACT), collaboration level (CL), and technological capacity (TC) should contribute to better innovation management in construction companies. The main purpose of this study was to elucidate the relationships among CL, TC, and INVACT in construction companies. For the purpose four regression models were developed to clarify the moderating/mediating effects of TC on INVACT and CL in construction companies by using a moderated/mediated regression analysis. A questionnaire was used to collect data from 116 construction companies. The empirical results show that CL has a significant impact on INVACT which is mediated by TC. In contrast, the moderating effect of CL with TC on INVACT is considerably weak. In construction companies, CL has an indirect effect on INVACT. The proposed model serves as a starting point for better innovation-management models in construction companies. The primary contributions of this research are the development of a new moderator/mediation model for innovation management in construction, so a new theoretical framework and an emphasis that, in the construction industry, there is a strong need for new ways of thinking about innovation management.
    publisherAmerican Society of Civil Engineers
    titleNew Three-Part Model of Innovation Activity in Construction Companies
    typeJournal Paper
    journal volume145
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001645
    page04019022
    treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian