Determination and Implication of Ultimate Water Cut in Well-Spacing Design for Developed Reservoirs With Water ConingSource: Journal of Energy Resources Technology:;2018:;volume 140:;issue 008::page 82902DOI: 10.1115/1.4039743Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: Theoretically, ultimate water-cut (WCult) defines stabilized well's oil and water production rates for uncontained oil pay underlain with water. However, in a real multiwell reservoir, the well's drainage area is contained by a no-flow boundary (NFB) that would control water coning, so the WCult concept should be qualified and related to the well-spacing size. Also, the presently used WCult formula derives from several simplifying assumptions, so its validity needs to be verified. The study shows that in multiwell bottom-water reservoirs, the production water-cut would never stabilize (after initial rapid increase) but would continue increasing at slow rate dependent on the production rate and well-spacing size. At each production rate, there is a minimum well-spacing size above which water-cut becomes practically constant at the value defined here as pseudoWCult. A new formula—developed in this study—correlates the minimum well-spacing with reservoir properties. Further, formula for pseudoWCult is derived by considering radial flow distortion effects in the oil and water zones. It is found that for well-spacing larger than the minimum well-spacing, the two effects-when combined-do not change the water-cut value. Thus, in practical applications, for sufficiently large well-spacing, the pseudoWCult values can be computed from the presently used WCult formula. The pseudoWCult concept has potential practical use in well-spacing design for ultimate recovery determined by the water cut economic limit, WCec. When the water-cut economic margin (WCec–WCult) is large, well-spacing has little effect on the ultimate recovery, so large well-spacing could be designed. However, when the water-cut economic margin is small, reservoir development decision should consider increase of final recovery by reducing well-spacing below the minimum well-spacing.
|
Collections
Show full item record
| contributor author | Prasun, Samir | |
| contributor author | Wojtanowicz, A. K. | |
| date accessioned | 2019-02-28T10:56:04Z | |
| date available | 2019-02-28T10:56:04Z | |
| date copyright | 4/9/2018 12:00:00 AM | |
| date issued | 2018 | |
| identifier issn | 0195-0738 | |
| identifier other | jert_140_08_082902.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4250938 | |
| description abstract | Theoretically, ultimate water-cut (WCult) defines stabilized well's oil and water production rates for uncontained oil pay underlain with water. However, in a real multiwell reservoir, the well's drainage area is contained by a no-flow boundary (NFB) that would control water coning, so the WCult concept should be qualified and related to the well-spacing size. Also, the presently used WCult formula derives from several simplifying assumptions, so its validity needs to be verified. The study shows that in multiwell bottom-water reservoirs, the production water-cut would never stabilize (after initial rapid increase) but would continue increasing at slow rate dependent on the production rate and well-spacing size. At each production rate, there is a minimum well-spacing size above which water-cut becomes practically constant at the value defined here as pseudoWCult. A new formula—developed in this study—correlates the minimum well-spacing with reservoir properties. Further, formula for pseudoWCult is derived by considering radial flow distortion effects in the oil and water zones. It is found that for well-spacing larger than the minimum well-spacing, the two effects-when combined-do not change the water-cut value. Thus, in practical applications, for sufficiently large well-spacing, the pseudoWCult values can be computed from the presently used WCult formula. The pseudoWCult concept has potential practical use in well-spacing design for ultimate recovery determined by the water cut economic limit, WCec. When the water-cut economic margin (WCec–WCult) is large, well-spacing has little effect on the ultimate recovery, so large well-spacing could be designed. However, when the water-cut economic margin is small, reservoir development decision should consider increase of final recovery by reducing well-spacing below the minimum well-spacing. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Determination and Implication of Ultimate Water Cut in Well-Spacing Design for Developed Reservoirs With Water Coning | |
| type | Journal Paper | |
| journal volume | 140 | |
| journal issue | 8 | |
| journal title | Journal of Energy Resources Technology | |
| identifier doi | 10.1115/1.4039743 | |
| journal fristpage | 82902 | |
| journal lastpage | 082902-12 | |
| tree | Journal of Energy Resources Technology:;2018:;volume 140:;issue 008 | |
| contenttype | Fulltext |