YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Untitled

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study;6
    Author:
    Rahimi Yaser;Tavakkoli-Moghaddam Reza;Iranmanesh Seyed Hossein;Vaez-Alaei Maliheh
    DOI: 10.1061/(ASCE)CO.1943-7862.0001486
    Publisher: American Society of Civil Engineers
    Abstract: Uncertainty and risks have been the inherent characteristics of large-scale projects. Although practitioners have applied different project risk management standards, numerous uncertainties, and risks in large-scale construction projects have led to significant failures in fulfilling a project’s goals. Therefore, in this study, a hybrid approach based on failure mode effects analysis (FMEA)/ISO 31 has been proposed to identify, evaluate, and control the problem effectively. This hybrid approach is not a very accurate approach in providing an appropriate risk response; hence, a mixed-integer programming (MIP) model has been proposed to select the optimized risk response strategies for the project. In the present study, a model based on synergies among project risk responses was developed that is capable of considering the various criteria in the objective function and optimizing them based on the defined projects. Risk response selection for a large-scale project is a complex problem. Because of the nondeterministic polynomial time (NP)-hardness of the presented model, two metaheuristic algorithms, namely, the self-adaptive imperialist competitive algorithm and invasive weed optimization, were developed to solve the proposed MIP model. A large-scale high-rise residential building was evaluated as a case study to investigate the model proposed in this study empirically.
    • Download: (3.208Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250347
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRahimi Yaser;Tavakkoli-Moghaddam Reza;Iranmanesh Seyed Hossein;Vaez-Alaei Maliheh
    date accessioned2019-02-26T07:55:50Z
    date available2019-02-26T07:55:50Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001486.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250347
    description abstractUncertainty and risks have been the inherent characteristics of large-scale projects. Although practitioners have applied different project risk management standards, numerous uncertainties, and risks in large-scale construction projects have led to significant failures in fulfilling a project’s goals. Therefore, in this study, a hybrid approach based on failure mode effects analysis (FMEA)/ISO 31 has been proposed to identify, evaluate, and control the problem effectively. This hybrid approach is not a very accurate approach in providing an appropriate risk response; hence, a mixed-integer programming (MIP) model has been proposed to select the optimized risk response strategies for the project. In the present study, a model based on synergies among project risk responses was developed that is capable of considering the various criteria in the objective function and optimizing them based on the defined projects. Risk response selection for a large-scale project is a complex problem. Because of the nondeterministic polynomial time (NP)-hardness of the presented model, two metaheuristic algorithms, namely, the self-adaptive imperialist competitive algorithm and invasive weed optimization, were developed to solve the proposed MIP model. A large-scale high-rise residential building was evaluated as a case study to investigate the model proposed in this study empirically.
    publisherAmerican Society of Civil Engineers
    typeJournal Paper
    journal volume144
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001486
    page4018043
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study;6
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian