YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Novel Precast Erection Method of Interlocking Mechanical Joints Using Couplers

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    Author:
    Nzabonimpa J. D.;Hong Won-Kee
    DOI: 10.1061/(ASCE)CO.1943-7862.0001482
    Publisher: American Society of Civil Engineers
    Abstract: Despite many advantages of precast concrete members, the conventional precast members lack in the treatment of construction waste, require concrete pour forms at joints, and their structural discontinuity leads to low redundancy in the load paths. This study aims to provide novel solutions to these problems by developing interlocking mechanical joints with fully restrained moments for the connections of both steel-concrete composite precast and reinforced concrete precast columns. In the proposed connections, a pair of steel plates was provided; each plate was installed at the bottom of the upper columns and on top of the lower columns, which were then connected monolithically via vertical column rebars passing through the metal plates, providing flexural capacity similar to that of conventional monolithic column connections. The column rebars were spliced by couplers that were manufactured to be fastened by the weight of the upper column, which was heavy enough to push the vertical rebars into the couplers in the area prepared at the lower part of the upper column, providing a monolithic joint for the connected precast columns. Throughout the erection test, it was found that conventional monolithic cast-in-place joints for assembling precast concrete frames can be replaced by the interlocking mechanical joints, offering rapid erection compared with traditional practices. The columns with proposed joints were also proved to demonstrate sufficient structural capacity. Stresses and strains were found within allowable limits on the basis of finite-element analysis considering concrete plasticity during the assembly of heavy precast frames. The erection test showed sufficient verticality ensuring rebars to be connected via couplers when the upper columns were released down to the lower columns. This novel frame did not require concrete cast at the joint, eliminating the use of concrete pour forms adopted in conventional construction methods over the last years. Effortless erection with structural efficiency was demonstrated by using the proposed assembly method, with a significant reduction in the time required to assemble precast frames, similar to that of steel frames. The novel frames proposed in this study are expected to replace the conventional concrete frames including cast-in-place frames and precast frames with traditional joints. These novel frames contribute to the concrete industry by providing rapid and dependable construction of both precast and cast-in place frames.
    • Download: (2.560Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Novel Precast Erection Method of Interlocking Mechanical Joints Using Couplers

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250344
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorNzabonimpa J. D.;Hong Won-Kee
    date accessioned2019-02-26T07:55:49Z
    date available2019-02-26T07:55:49Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001482.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250344
    description abstractDespite many advantages of precast concrete members, the conventional precast members lack in the treatment of construction waste, require concrete pour forms at joints, and their structural discontinuity leads to low redundancy in the load paths. This study aims to provide novel solutions to these problems by developing interlocking mechanical joints with fully restrained moments for the connections of both steel-concrete composite precast and reinforced concrete precast columns. In the proposed connections, a pair of steel plates was provided; each plate was installed at the bottom of the upper columns and on top of the lower columns, which were then connected monolithically via vertical column rebars passing through the metal plates, providing flexural capacity similar to that of conventional monolithic column connections. The column rebars were spliced by couplers that were manufactured to be fastened by the weight of the upper column, which was heavy enough to push the vertical rebars into the couplers in the area prepared at the lower part of the upper column, providing a monolithic joint for the connected precast columns. Throughout the erection test, it was found that conventional monolithic cast-in-place joints for assembling precast concrete frames can be replaced by the interlocking mechanical joints, offering rapid erection compared with traditional practices. The columns with proposed joints were also proved to demonstrate sufficient structural capacity. Stresses and strains were found within allowable limits on the basis of finite-element analysis considering concrete plasticity during the assembly of heavy precast frames. The erection test showed sufficient verticality ensuring rebars to be connected via couplers when the upper columns were released down to the lower columns. This novel frame did not require concrete cast at the joint, eliminating the use of concrete pour forms adopted in conventional construction methods over the last years. Effortless erection with structural efficiency was demonstrated by using the proposed assembly method, with a significant reduction in the time required to assemble precast frames, similar to that of steel frames. The novel frames proposed in this study are expected to replace the conventional concrete frames including cast-in-place frames and precast frames with traditional joints. These novel frames contribute to the concrete industry by providing rapid and dependable construction of both precast and cast-in place frames.
    publisherAmerican Society of Civil Engineers
    titleNovel Precast Erection Method of Interlocking Mechanical Joints Using Couplers
    typeJournal Paper
    journal volume144
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001482
    page4018036
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian