YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Relationship Conflict in Construction Management: Performance and Productivity Problem

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    Author:
    Vaux James S.;Kirk W. Max
    DOI: 10.1061/(ASCE)CO.1943-7862.0001478
    Publisher: American Society of Civil Engineers
    Abstract: Performance and productivity in construction management are essential for schedule and profit considerations, but are often diminished by conflict. Task conflict provides incentive for decisions and innovative solutions, whereas interpersonal conflict, also referred to as relationship conflict, is detrimental to performance and productivity because it affects schedules, cognition and collaboration efforts, and the morale of the team. This qualitative study investigates how relationship conflict affects performance and productivity among construction management professionals. Interviews were conducted in 18 construction firms with 25 construction management professionals, including project executives, senior project managers, project managers, and superintendents. The goal is to understand the antecedents and consequences of relationship conflict within construction management, and discover methods used to mitigate these effects. Key antecedents producing relationship conflict are lack of communication, old-school attitude, and lump-sum contracts. The key individuals generating relationship conflict are the owner or owner’s representative, subcontractors, and superintendents. Consequences of relationship conflict include schedule delays, lowered morale and motivation, and reduced profit, whereas mitigating factors are good communication and trust building.
    • Download: (490.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Relationship Conflict in Construction Management: Performance and Productivity Problem

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250339
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorVaux James S.;Kirk W. Max
    date accessioned2019-02-26T07:55:46Z
    date available2019-02-26T07:55:46Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001478.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250339
    description abstractPerformance and productivity in construction management are essential for schedule and profit considerations, but are often diminished by conflict. Task conflict provides incentive for decisions and innovative solutions, whereas interpersonal conflict, also referred to as relationship conflict, is detrimental to performance and productivity because it affects schedules, cognition and collaboration efforts, and the morale of the team. This qualitative study investigates how relationship conflict affects performance and productivity among construction management professionals. Interviews were conducted in 18 construction firms with 25 construction management professionals, including project executives, senior project managers, project managers, and superintendents. The goal is to understand the antecedents and consequences of relationship conflict within construction management, and discover methods used to mitigate these effects. Key antecedents producing relationship conflict are lack of communication, old-school attitude, and lump-sum contracts. The key individuals generating relationship conflict are the owner or owner’s representative, subcontractors, and superintendents. Consequences of relationship conflict include schedule delays, lowered morale and motivation, and reduced profit, whereas mitigating factors are good communication and trust building.
    publisherAmerican Society of Civil Engineers
    titleRelationship Conflict in Construction Management: Performance and Productivity Problem
    typeJournal Paper
    journal volume144
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001478
    page4018032
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian