YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    Author:
    Farshchian Mohammad Mahdi;Heravi Gholamreza
    DOI: 10.1061/(ASCE)CO.1943-7862.0001476
    Publisher: American Society of Civil Engineers
    Abstract: Unforeseen conditions and uncertainties typically surround construction projects during the execution phase. These uncertainties are the main reason for schedule delays and cost overruns. Stochastic simulation models have been developed to consider projects’ uncertainties and various probabilities. Although numerous studies have been conducted on causes and effects of uncertainties in individual projects, the uncertainties in a portfolio of projects have not been assessed. This study presents an agent-based simulation model developed to consider time and cost uncertainties in an owner’s portfolio of projects. The model can simulate different conditions and scenarios, taking into account costs inflation during projects’ execution periods. It contributes to the portfolio management body of knowledge by simulating the progress of a portfolio of projects against different scenarios, considering stochastic time, cost, and inflation rates. The simulation results assist owners to do probabilistic assessment and reduce uncertainties and risks related to time, cost, and revenue of their portfolio of projects and calculate the confidence level of their decisions and strategies. To demonstrate the capabilities of the model, an example portfolio containing 5 projects is modeled and different scenarios are evaluated. Results of the simulation indicate that the model works well and provides detailed information at the portfolio level and projects’ level. Fitting probability distributions to the results, it is seen that using the most likely numbers as deterministic parameters may lead to overestimating portfolio revenue and cost. The results indicate that using the portfolio stochastic agent-based simulation model can have significant effects on organizations’ predictions regarding their costs and revenues.
    • Download: (1.956Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250337
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFarshchian Mohammad Mahdi;Heravi Gholamreza
    date accessioned2019-02-26T07:55:45Z
    date available2019-02-26T07:55:45Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001476.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250337
    description abstractUnforeseen conditions and uncertainties typically surround construction projects during the execution phase. These uncertainties are the main reason for schedule delays and cost overruns. Stochastic simulation models have been developed to consider projects’ uncertainties and various probabilities. Although numerous studies have been conducted on causes and effects of uncertainties in individual projects, the uncertainties in a portfolio of projects have not been assessed. This study presents an agent-based simulation model developed to consider time and cost uncertainties in an owner’s portfolio of projects. The model can simulate different conditions and scenarios, taking into account costs inflation during projects’ execution periods. It contributes to the portfolio management body of knowledge by simulating the progress of a portfolio of projects against different scenarios, considering stochastic time, cost, and inflation rates. The simulation results assist owners to do probabilistic assessment and reduce uncertainties and risks related to time, cost, and revenue of their portfolio of projects and calculate the confidence level of their decisions and strategies. To demonstrate the capabilities of the model, an example portfolio containing 5 projects is modeled and different scenarios are evaluated. Results of the simulation indicate that the model works well and provides detailed information at the portfolio level and projects’ level. Fitting probability distributions to the results, it is seen that using the most likely numbers as deterministic parameters may lead to overestimating portfolio revenue and cost. The results indicate that using the portfolio stochastic agent-based simulation model can have significant effects on organizations’ predictions regarding their costs and revenues.
    publisherAmerican Society of Civil Engineers
    titleProbabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation
    typeJournal Paper
    journal volume144
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001476
    page4018028
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian