YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    Author:
    Bingham Evan;Gibson G. Edward;Asmar Mounir El
    DOI: 10.1061/(ASCE)CO.1943-7862.0001469
    Publisher: American Society of Civil Engineers
    Abstract: One of the most critical decisions made by transportation project stakeholders is the choice of a project delivery method for their project. Delivery methods have been shown to significantly impact project cost and schedule. As the use of alternative project delivery methods increases, the perceptions of the advantages and disadvantages to using a particular method have matured. This paper reports on a national study of over 8 transportation owners and designers to measure their perceptions of the three most widely used delivery methods: design bid build (DBB), construction manager at risk (CMAR), and design build (DB). The study develops a list of factors that influence the selection of a delivery method, and then tests the most significant factors that lead to the selection of each individual method. Analyses using Fisher’s least significant difference intervals and multiple range tests allow for the identification of specific correlations between the delivery method and motivating factors or project goals. The analyses show that delivery method selection is motivated primarily by project urgency, cost, and risk allocation. For the three main delivery methods of DBB, CMAR, and DB, motivation for their selection is primarily based on cost, risk allocation, and project urgency, respectively. User perceptions align with findings from literature in terms of schedule performance, but do not align in terms of cost performance. This research contributes to the body of knowledge by reporting on the most current motivating factors for the selection and use of the most popular delivery methods.
    • Download: (1.249Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250332
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorBingham Evan;Gibson G. Edward;Asmar Mounir El
    date accessioned2019-02-26T07:55:43Z
    date available2019-02-26T07:55:43Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001469.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250332
    description abstractOne of the most critical decisions made by transportation project stakeholders is the choice of a project delivery method for their project. Delivery methods have been shown to significantly impact project cost and schedule. As the use of alternative project delivery methods increases, the perceptions of the advantages and disadvantages to using a particular method have matured. This paper reports on a national study of over 8 transportation owners and designers to measure their perceptions of the three most widely used delivery methods: design bid build (DBB), construction manager at risk (CMAR), and design build (DB). The study develops a list of factors that influence the selection of a delivery method, and then tests the most significant factors that lead to the selection of each individual method. Analyses using Fisher’s least significant difference intervals and multiple range tests allow for the identification of specific correlations between the delivery method and motivating factors or project goals. The analyses show that delivery method selection is motivated primarily by project urgency, cost, and risk allocation. For the three main delivery methods of DBB, CMAR, and DB, motivation for their selection is primarily based on cost, risk allocation, and project urgency, respectively. User perceptions align with findings from literature in terms of schedule performance, but do not align in terms of cost performance. This research contributes to the body of knowledge by reporting on the most current motivating factors for the selection and use of the most popular delivery methods.
    publisherAmerican Society of Civil Engineers
    titleMeasuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests
    typeJournal Paper
    journal volume144
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001469
    page4018033
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian