YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    Author:
    Delgado Laura;Shealy Tripp;Garvin Michael;Pearce Annie
    DOI: 10.1061/(ASCE)CO.1943-7862.0001464
    Publisher: American Society of Civil Engineers
    Abstract: The federal government is the country’s largest energy user and government facilities are responsible for 4% of total energy emissions, yet traditional energy-efficiency methods are not reducing emissions at the federal government’s annual goal of 2.5%. Behavioral science states decision makers do not always understand or anticipate outcomes of possible choices because of time or processing capability, and cognitive biases (i.e., loss aversion and anchoring) reduce consideration for energy efficiency. The hypothesis is that choice architecture, the structure of procurement options, influences facilities management decisions. In this study engineering and building science students (n=56) were presented with scenarios varying in cost and energy efficiency. The control group received the current government facilities procurement form, and the intervention group received a modified version of the government form prompting them to calculate the payback period prior to choosing an option. The prompt for payback period framed the decision as comparing longer gains rather than upfront costs. The results indicate statistically significant differences (p=.3) between participants in the control who did not choose the more expensive, more efficient option and those in the intervention group who frequently did choose this option. These results demonstrate potential applications for choice architecture to improve government facilities management energy-reduction decisions. This behavioral approach complements what are often costlier investments in technology and holds promise for less intrusive solutions compared with legal and economic policies for energy reduction.
    • Download: (267.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Framing Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250326
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDelgado Laura;Shealy Tripp;Garvin Michael;Pearce Annie
    date accessioned2019-02-26T07:55:39Z
    date available2019-02-26T07:55:39Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001464.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250326
    description abstractThe federal government is the country’s largest energy user and government facilities are responsible for 4% of total energy emissions, yet traditional energy-efficiency methods are not reducing emissions at the federal government’s annual goal of 2.5%. Behavioral science states decision makers do not always understand or anticipate outcomes of possible choices because of time or processing capability, and cognitive biases (i.e., loss aversion and anchoring) reduce consideration for energy efficiency. The hypothesis is that choice architecture, the structure of procurement options, influences facilities management decisions. In this study engineering and building science students (n=56) were presented with scenarios varying in cost and energy efficiency. The control group received the current government facilities procurement form, and the intervention group received a modified version of the government form prompting them to calculate the payback period prior to choosing an option. The prompt for payback period framed the decision as comparing longer gains rather than upfront costs. The results indicate statistically significant differences (p=.3) between participants in the control who did not choose the more expensive, more efficient option and those in the intervention group who frequently did choose this option. These results demonstrate potential applications for choice architecture to improve government facilities management energy-reduction decisions. This behavioral approach complements what are often costlier investments in technology and holds promise for less intrusive solutions compared with legal and economic policies for energy reduction.
    publisherAmerican Society of Civil Engineers
    titleFraming Energy Efficiency with Payback Period: Empirical Study to Increase Energy Consideration during Facility Procurement Processes
    typeJournal Paper
    journal volume144
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001464
    page4018027
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian