YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Structural Stakeholder Model in Public Engagement for Construction Development Projects

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    Author:
    Yu Jingyu;Leung Mei-yung
    DOI: 10.1061/(ASCE)CO.1943-7862.0001462
    Publisher: American Society of Civil Engineers
    Abstract: Construction development projects are often complicated and influence multiple stakeholders with different requirements and interests. Public engagement (PE) has emerged as a prerequisite for collecting stakeholders’ opinions and involving them in the planning and decision making of construction development projects. It is not easy to identify and manage stakeholders in PE because different stakeholders possess different types of power and interests that have the potential to dramatically affect stakeholder behaviors and final project outcomes. However, the effects of stakeholder attributes (i.e., power and interest) on stakeholder management in PE and final PE outcomes have been insufficiently studied. This study aimed to investigate the complicated relationships between stakeholders’ power, interests, and PE outcomes through a questionnaire survey. An integrated model for stakeholder power, interest, and PE outcomes was developed using a structural equation model. The results showed that different forms of power and interest influenced final PE outcomes either directly or indirectly. PE organizers are encouraged to directly involve project teams, experts, and reputable stakeholders in the PE process and allow the media and nongovernmental organizations to monitor the decision-making process. The findings of this study will contribute to stakeholder management for PE in construction projects by developing a structural model that can be adopted to identify stakeholder power and interests and engage appropriate stakeholders in the decision-making process. It is expected to improve PE outcomes and enhance stakeholder satisfaction for construction development projects.
    • Download: (178.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Structural Stakeholder Model in Public Engagement for Construction Development Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250325
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYu Jingyu;Leung Mei-yung
    date accessioned2019-02-26T07:55:39Z
    date available2019-02-26T07:55:39Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001462.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250325
    description abstractConstruction development projects are often complicated and influence multiple stakeholders with different requirements and interests. Public engagement (PE) has emerged as a prerequisite for collecting stakeholders’ opinions and involving them in the planning and decision making of construction development projects. It is not easy to identify and manage stakeholders in PE because different stakeholders possess different types of power and interests that have the potential to dramatically affect stakeholder behaviors and final project outcomes. However, the effects of stakeholder attributes (i.e., power and interest) on stakeholder management in PE and final PE outcomes have been insufficiently studied. This study aimed to investigate the complicated relationships between stakeholders’ power, interests, and PE outcomes through a questionnaire survey. An integrated model for stakeholder power, interest, and PE outcomes was developed using a structural equation model. The results showed that different forms of power and interest influenced final PE outcomes either directly or indirectly. PE organizers are encouraged to directly involve project teams, experts, and reputable stakeholders in the PE process and allow the media and nongovernmental organizations to monitor the decision-making process. The findings of this study will contribute to stakeholder management for PE in construction projects by developing a structural model that can be adopted to identify stakeholder power and interests and engage appropriate stakeholders in the decision-making process. It is expected to improve PE outcomes and enhance stakeholder satisfaction for construction development projects.
    publisherAmerican Society of Civil Engineers
    titleStructural Stakeholder Model in Public Engagement for Construction Development Projects
    typeJournal Paper
    journal volume144
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001462
    page4018046
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian