YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
    Author:
    Castillo Tito;Alarcón Luis F.;Salvatierra José Luis
    DOI: 10.1061/(ASCE)CO.1943-7862.0001443
    Publisher: American Society of Civil Engineers
    Abstract: Management practices of lean production within the last planner system (LPS) have enabled significant improvements in project performance worldwide. These improvements are, in part, attributed to practices that strengthen social networks within projects and enhance effective communication. However, the relationships by which LPS management practices and organizational characteristics impact project performance are not well known and require in-depth investigation. To obtain a better understanding of these relationships, analyzed data was collected from nine construction projects from two Chilean construction companies. Correlation analysis was applied to the degree of implementation of LPS practices, social networks metrics, and key performance indicators (KPIs). Significant relationships were found among these three variables. It was also found that a high implementation level of LPS practices is usually related to improved project performance, although it is not always associated with improved network metrics. The results provide insights into project performance relationships with the organization and LPS practices that should lead to improve the managerial decision-making process regarding organizational and management practices for better project performance. The role of social network properties on project performance requires further research because optimal metrics have not been established yet.
    • Download: (1.132Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250306
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorCastillo Tito;Alarcón Luis F.;Salvatierra José Luis
    date accessioned2019-02-26T07:55:26Z
    date available2019-02-26T07:55:26Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001443.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250306
    description abstractManagement practices of lean production within the last planner system (LPS) have enabled significant improvements in project performance worldwide. These improvements are, in part, attributed to practices that strengthen social networks within projects and enhance effective communication. However, the relationships by which LPS management practices and organizational characteristics impact project performance are not well known and require in-depth investigation. To obtain a better understanding of these relationships, analyzed data was collected from nine construction projects from two Chilean construction companies. Correlation analysis was applied to the degree of implementation of LPS practices, social networks metrics, and key performance indicators (KPIs). Significant relationships were found among these three variables. It was also found that a high implementation level of LPS practices is usually related to improved project performance, although it is not always associated with improved network metrics. The results provide insights into project performance relationships with the organization and LPS practices that should lead to improve the managerial decision-making process regarding organizational and management practices for better project performance. The role of social network properties on project performance requires further research because optimal metrics have not been established yet.
    publisherAmerican Society of Civil Engineers
    titleEffects of Last Planner System Practices on Social Networks and the Performance of Construction Projects
    typeJournal Paper
    journal volume144
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001443
    page4017120
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian