YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
    Author:
    Antunes Ricardo;González Vicente A.;Walsh Kenneth;Rojas Omar;O’Sullivan Michael;Odeh Ibrahim
    DOI: 10.1061/(ASCE)CO.1943-7862.0001438
    Publisher: American Society of Civil Engineers
    Abstract: Despite being inaccurate, linear models are often used by construction managers to describe production, which limits the development and application of a production theory. The objective of this study is to formulate and test new equations comprehending the non-steady-state conditions of repetitive project-driven processes in construction to calculate cycle time and capacity based on productivity function models. The algebraic calculations were developed from Little’s Law to estimate cycle times and capacity and then tested on productivity function models of 11 construction processes (two cases arranged in a supply chain). It has been reaffirmed that the transient time negatively impacts process productivity. The transient time and theoretical average cycle time showed a proportional relationship to the average cycle times of the samples, resulting in a benchmarking ranking close to the one measured. This study contributes to the body of knowledge by introducing equations for capacity and cycle time based on a process productivity function model that can be used on processes in any state. It can be an alternative to three-point estimation, for instance.
    • Download: (1.152Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Benchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250302
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAntunes Ricardo;González Vicente A.;Walsh Kenneth;Rojas Omar;O’Sullivan Michael;Odeh Ibrahim
    date accessioned2019-02-26T07:55:23Z
    date available2019-02-26T07:55:23Z
    date issued2018
    identifier other%28ASCE%29CO.1943-7862.0001438.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250302
    description abstractDespite being inaccurate, linear models are often used by construction managers to describe production, which limits the development and application of a production theory. The objective of this study is to formulate and test new equations comprehending the non-steady-state conditions of repetitive project-driven processes in construction to calculate cycle time and capacity based on productivity function models. The algebraic calculations were developed from Little’s Law to estimate cycle times and capacity and then tested on productivity function models of 11 construction processes (two cases arranged in a supply chain). It has been reaffirmed that the transient time negatively impacts process productivity. The transient time and theoretical average cycle time showed a proportional relationship to the average cycle times of the samples, resulting in a benchmarking ranking close to the one measured. This study contributes to the body of knowledge by introducing equations for capacity and cycle time based on a process productivity function model that can be used on processes in any state. It can be an alternative to three-point estimation, for instance.
    publisherAmerican Society of Civil Engineers
    titleBenchmarking Project-Driven Production in Construction Using Productivity Function: Capacity and Cycle Time
    typeJournal Paper
    journal volume144
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001438
    page4017118
    treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian