YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Buffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2018:;Volume ( 004 ):;issue: 001
    Author:
    Balta Semsettin;Birgonul M. Talat;Dikmen Irem
    DOI: 10.1061/AJRUA6.0000948
    Publisher: American Society of Civil Engineers
    Abstract: Timely completion of dam and hydroelectric power plant (HEPP) projects is indispensable for the countries constructing them due to their economic, political, and social impacts. Robust and stable schedules should be created at the beginning of these projects in order to realistically estimate project durations considering uncertainties and variations. This paper proposes a buffer sizing methodology based on fuzzy risk assessment which can be used to calculate time buffers accurately for concrete gravity dam and HEPP projects by considering the vulnerability of activities to various risk factors as well as their interdependencies. A generic schedule is developed and 89 potential causes of delay/risk factors are identified for the concrete gravity dam and HEPP projects. Risk assessment is conducted at the activity level. The inputs of the model are frequency and severity of risk factors, and the output is estimated time buffer as a percentage of original duration. Implementation of the model is illustrated by an example project. Results show that outputs of the model can be used for scheduling, estimation of time buffers, and risk management of concrete gravity dam and HEPP projects. Although the model and its outputs are specific for concrete gravity dams, the buffer sizing methodology based on fuzzy risk assessment can easily be adapted to other types of construction projects.
    • Download: (1.184Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Buffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250176
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    Show full item record

    contributor authorBalta Semsettin;Birgonul M. Talat;Dikmen Irem
    date accessioned2019-02-26T07:54:14Z
    date available2019-02-26T07:54:14Z
    date issued2018
    identifier otherAJRUA6.0000948.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250176
    description abstractTimely completion of dam and hydroelectric power plant (HEPP) projects is indispensable for the countries constructing them due to their economic, political, and social impacts. Robust and stable schedules should be created at the beginning of these projects in order to realistically estimate project durations considering uncertainties and variations. This paper proposes a buffer sizing methodology based on fuzzy risk assessment which can be used to calculate time buffers accurately for concrete gravity dam and HEPP projects by considering the vulnerability of activities to various risk factors as well as their interdependencies. A generic schedule is developed and 89 potential causes of delay/risk factors are identified for the concrete gravity dam and HEPP projects. Risk assessment is conducted at the activity level. The inputs of the model are frequency and severity of risk factors, and the output is estimated time buffer as a percentage of original duration. Implementation of the model is illustrated by an example project. Results show that outputs of the model can be used for scheduling, estimation of time buffers, and risk management of concrete gravity dam and HEPP projects. Although the model and its outputs are specific for concrete gravity dams, the buffer sizing methodology based on fuzzy risk assessment can easily be adapted to other types of construction projects.
    publisherAmerican Society of Civil Engineers
    titleBuffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects
    typeJournal Paper
    journal volume4
    journal issue1
    journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    identifier doi10.1061/AJRUA6.0000948
    page4017039
    treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2018:;Volume ( 004 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian