YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    New Constraint-Handling Technique for Evolutionary Optimization of Reservoir Operation

    Source: Journal of Water Resources Planning and Management:;2018:;Volume ( 144 ):;issue: 003
    Author:
    Hu Tengfei;Mao Jingqiao;Tian Mingming;Dai Huichao;Rong Guiwen
    DOI: 10.1061/(ASCE)WR.1943-5452.0000891
    Publisher: American Society of Civil Engineers
    Abstract: Evolutionary optimization of reservoir operation is subject to complex physical and operational constraints. Constraint-handling techniques (CHTs) in this field are predominantly problem-specific or based on certain evolutionary algorithms; generally applicable CHTs are seldom tested against reservoir scheduling problems. This study proposes an independent CHT to accommodate the reservoir operation constraints, called the nondomination rank-based adaptive method (NRAM). The NRAM is straightforward to use and free of parameter tuning. The process emphasizes exploiting information from infeasible individuals and preserving them to promote convergence to global optima on a feasible space boundary. Moreover, the method adjusts the population composition dynamically to facilitate exploration or local search. The NRAM was applied to the hydropower scheduling of the Three Gorges Reservoir and Gezhouba Reservoir in China. Results show that the NRAM performs slightly better than three other well-regarded CHTs but requires mildly longer computational time. In addition, the genetic algorithm with the NRAM outperforms dynamic programming that is commonly used for hydropower scheduling. The operation schedules the NRAM provides are well suited for maximizing hydropower generation with all constraints satisfied.
    • Download: (921.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      New Constraint-Handling Technique for Evolutionary Optimization of Reservoir Operation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4250075
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorHu Tengfei;Mao Jingqiao;Tian Mingming;Dai Huichao;Rong Guiwen
    date accessioned2019-02-26T07:53:16Z
    date available2019-02-26T07:53:16Z
    date issued2018
    identifier other%28ASCE%29WR.1943-5452.0000891.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250075
    description abstractEvolutionary optimization of reservoir operation is subject to complex physical and operational constraints. Constraint-handling techniques (CHTs) in this field are predominantly problem-specific or based on certain evolutionary algorithms; generally applicable CHTs are seldom tested against reservoir scheduling problems. This study proposes an independent CHT to accommodate the reservoir operation constraints, called the nondomination rank-based adaptive method (NRAM). The NRAM is straightforward to use and free of parameter tuning. The process emphasizes exploiting information from infeasible individuals and preserving them to promote convergence to global optima on a feasible space boundary. Moreover, the method adjusts the population composition dynamically to facilitate exploration or local search. The NRAM was applied to the hydropower scheduling of the Three Gorges Reservoir and Gezhouba Reservoir in China. Results show that the NRAM performs slightly better than three other well-regarded CHTs but requires mildly longer computational time. In addition, the genetic algorithm with the NRAM outperforms dynamic programming that is commonly used for hydropower scheduling. The operation schedules the NRAM provides are well suited for maximizing hydropower generation with all constraints satisfied.
    publisherAmerican Society of Civil Engineers
    titleNew Constraint-Handling Technique for Evolutionary Optimization of Reservoir Operation
    typeJournal Paper
    journal volume144
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)WR.1943-5452.0000891
    page4017097
    treeJournal of Water Resources Planning and Management:;2018:;Volume ( 144 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian