YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Short-Term Setup of Jacked Piles in a Calibration Chamber

    Source: Journal of Geotechnical and Geoenvironmental Engineering:;2018:;Volume ( 144 ):;issue: 012
    Author:
    Tovar-Valencia Ruben D.;Galvis-Castro Ayda C.;Prezzi Monica;Salgado Rodrigo
    DOI: 10.1061/(ASCE)GT.1943-5606.0001984
    Publisher: American Society of Civil Engineers
    Abstract: The time-dependent increase in axial resistance (setup) of jacked or driven piles in sand is still not well understood, and its quantification remains a challenge. In this paper, a series of tests is performed on model piles jacked in sand in a half-cylindrical calibration chamber with image analysis capabilities to study setup. Load cell measurements, which are used to determine changes in pile resistance with time, are considered in combination with digital images taken with CMOS cameras and a handheld microscope positioned in front of the transparent observation windows of the chamber. Using the digital image correlation (DIC) technique, images taken during pile installation and throughout a waiting period of up to 1 days are analyzed to detect any change in the displacement and strain field in the sand domain that would indicate stress redistribution leading to changes in axial resistance. In addition, images of a set of 5 particles are analyzed to investigate any possible enhancement of particle interlocking or any other change in particle position or orientation during the waiting periods. The results of the analyses show negligible relative displacements and strains in the sand domain and negligible displacement or rotation of individual sand particles. These results are consistent with the measured axial capacities of the model piles, which are largely the same regardless of the time after installation at which the load tests were performed.
    • Download: (6.507Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Short-Term Setup of Jacked Piles in a Calibration Chamber

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249788
    Collections
    • Journal of Geotechnical and Geoenvironmental Engineering

    Show full item record

    contributor authorTovar-Valencia Ruben D.;Galvis-Castro Ayda C.;Prezzi Monica;Salgado Rodrigo
    date accessioned2019-02-26T07:50:43Z
    date available2019-02-26T07:50:43Z
    date issued2018
    identifier other%28ASCE%29GT.1943-5606.0001984.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249788
    description abstractThe time-dependent increase in axial resistance (setup) of jacked or driven piles in sand is still not well understood, and its quantification remains a challenge. In this paper, a series of tests is performed on model piles jacked in sand in a half-cylindrical calibration chamber with image analysis capabilities to study setup. Load cell measurements, which are used to determine changes in pile resistance with time, are considered in combination with digital images taken with CMOS cameras and a handheld microscope positioned in front of the transparent observation windows of the chamber. Using the digital image correlation (DIC) technique, images taken during pile installation and throughout a waiting period of up to 1 days are analyzed to detect any change in the displacement and strain field in the sand domain that would indicate stress redistribution leading to changes in axial resistance. In addition, images of a set of 5 particles are analyzed to investigate any possible enhancement of particle interlocking or any other change in particle position or orientation during the waiting periods. The results of the analyses show negligible relative displacements and strains in the sand domain and negligible displacement or rotation of individual sand particles. These results are consistent with the measured axial capacities of the model piles, which are largely the same regardless of the time after installation at which the load tests were performed.
    publisherAmerican Society of Civil Engineers
    titleShort-Term Setup of Jacked Piles in a Calibration Chamber
    typeJournal Paper
    journal volume144
    journal issue12
    journal titleJournal of Geotechnical and Geoenvironmental Engineering
    identifier doi10.1061/(ASCE)GT.1943-5606.0001984
    page4018092
    treeJournal of Geotechnical and Geoenvironmental Engineering:;2018:;Volume ( 144 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian