YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Claims for Extension of Time and Additional Payment under Common Law FIDIC: Civil Law Analysis

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    Author:
    Fawzy Salwa A.;El-adaway Islam H.;Perreau-Saussine Louis;Abdel Wahab Mohamed S.;Hamed Tarek H.
    DOI: 10.1061/(ASCE)LA.1943-4170.0000276
    Publisher: American Society of Civil Engineers
    Abstract: Lately, Egypt has been at the forefront of multiple megaconstruction projects and the same trend is expected to continue in the future. Since such projects are mainly carried out by international contractors, the associated construction contracts mainly use the standard conditions of contract for international projects published by the Fédération Internationale des Ingénieurs-Conseils (FIDIC). The FIDIC is based on legal concepts rooted in the common law system, whereas the legal doctrine that Egypt follows is founded upon civil law principles as mandated by the Egyptian civil law (ECL). Therefore, employers, contractors, international financing organizations, engineers, and lawyers, who use FIDIC in Egypt, need to understand the interpretation of the FIDIC provisions against a civil law background. This paper uses a multistep interdependent desktop research methodology to investigate the application of the general provisions of extension of time and additional payment of the FIDIC Conditions of Contract for Construction–Red Book 1999, i.e., FIDIC (CONS), in the context of ECL. To do so, provisions of extension of time and additional payment were studied separately under the FIDIC (CONS), and similarly under the ECL. Consequently, the authors conducted a comparative analysis to recognize similarities and differences between both FIDIC (CONS) and ECL. Finally, the authors identified gaps and requirements for successful application of FIDIC (CONS) under ECL. The analysis reveals that the ECL does not provide clear procedures and mechanisms regulating the contractor’s entitlement to extension of time and/or additional payment. Accordingly, it is recommended to add a new, three-part article to the ECL as well as to amend the first two paragraphs of Subclause 2.1 in the FIDIC (CONS). It is envisaged that this research would help stakeholders in the construction industry, entering into projects based on the FIDIC (CONS) in Egypt, to properly manage time provisions and the associated delays and risks leading to additional payment in the construction contracts. This should help minimize, as much as possible, disputes associated with and/or resulting from the delays and claims for extensions of time and/or additional payment. Since most of the Middle East countries follow civil law jurisdictions, and are most heavily influenced by the ECL, it is also envisaged that this research would support effective and efficient contract administration of construction projects in the ME region.
    • Download: (360.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Claims for Extension of Time and Additional Payment under Common Law FIDIC: Civil Law Analysis

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249614
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorFawzy Salwa A.;El-adaway Islam H.;Perreau-Saussine Louis;Abdel Wahab Mohamed S.;Hamed Tarek H.
    date accessioned2019-02-26T07:49:11Z
    date available2019-02-26T07:49:11Z
    date issued2018
    identifier other%28ASCE%29LA.1943-4170.0000276.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249614
    description abstractLately, Egypt has been at the forefront of multiple megaconstruction projects and the same trend is expected to continue in the future. Since such projects are mainly carried out by international contractors, the associated construction contracts mainly use the standard conditions of contract for international projects published by the Fédération Internationale des Ingénieurs-Conseils (FIDIC). The FIDIC is based on legal concepts rooted in the common law system, whereas the legal doctrine that Egypt follows is founded upon civil law principles as mandated by the Egyptian civil law (ECL). Therefore, employers, contractors, international financing organizations, engineers, and lawyers, who use FIDIC in Egypt, need to understand the interpretation of the FIDIC provisions against a civil law background. This paper uses a multistep interdependent desktop research methodology to investigate the application of the general provisions of extension of time and additional payment of the FIDIC Conditions of Contract for Construction–Red Book 1999, i.e., FIDIC (CONS), in the context of ECL. To do so, provisions of extension of time and additional payment were studied separately under the FIDIC (CONS), and similarly under the ECL. Consequently, the authors conducted a comparative analysis to recognize similarities and differences between both FIDIC (CONS) and ECL. Finally, the authors identified gaps and requirements for successful application of FIDIC (CONS) under ECL. The analysis reveals that the ECL does not provide clear procedures and mechanisms regulating the contractor’s entitlement to extension of time and/or additional payment. Accordingly, it is recommended to add a new, three-part article to the ECL as well as to amend the first two paragraphs of Subclause 2.1 in the FIDIC (CONS). It is envisaged that this research would help stakeholders in the construction industry, entering into projects based on the FIDIC (CONS) in Egypt, to properly manage time provisions and the associated delays and risks leading to additional payment in the construction contracts. This should help minimize, as much as possible, disputes associated with and/or resulting from the delays and claims for extensions of time and/or additional payment. Since most of the Middle East countries follow civil law jurisdictions, and are most heavily influenced by the ECL, it is also envisaged that this research would support effective and efficient contract administration of construction projects in the ME region.
    publisherAmerican Society of Civil Engineers
    titleClaims for Extension of Time and Additional Payment under Common Law FIDIC: Civil Law Analysis
    typeJournal Paper
    journal volume10
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000276
    page6518002
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian