YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Lifecycle Cost Study of Underground Freight Transportation Systems in Texas

    Source: Journal of Pipeline Systems Engineering and Practice:;2018:;Volume ( 009 ):;issue: 003
    Author:
    Janbaz Saeed;Shahandashti Mohsen;Najafi Mohammad;Tavakoli Razieh
    DOI: 10.1061/(ASCE)PS.1949-1204.0000322
    Publisher: American Society of Civil Engineers
    Abstract: Lifecycle cost analysis is a critical step in feasibility studies of future infrastructure projects. Lifecycle cost analysis of innovative infrastructure systems, such as a proposed underground freight transportation (UFT) is often challenging since there is not adequate historical cost information that is typically required for lifecycle cost analysis of these systems. The UFT system is a class of automated transportation systems in which vehicles carry freight through tunnels or pipelines under existing highways and roads between intermodal terminals. The objective of this paper is to assess the lifecycle cost of five UFT system alternatives in Texas. A stakeholder committee in conjunction with the Texas Department of Transportation (TxDOT) selected five alternatives: transporting shipping containers for 42.33 km (25 mi), 24.14 km (15 mi), and 6.43 km (4 mi); crate size cargoes for 24.14 km (15 mi); and pallet size cargoes for 24.14 km (15 mi). This analysis includes the capital and annual costs of a proposed UFT system in Texas over a lifecycle time of 1 years. The UFT system has major capital cost components including costs of tunnel construction, linear induction motors (LIMs), and vehicles. The annual cost components of the UFT system are the costs of maintenance, energy consumption, and administration. Historical tunneling costs are used to create a regression model to estimate costs of tunnels with various sizes. Quotes from the industry and RSMeans cost data are used to estimate the costs of vehicles, LIMs, UFT maintenance, energy consumption, and administration. The results of this paper inform transportation planners about lifecycle costs of the UFT system. Lifecycle costs of the UFT system include construction, maintenance, and operation costs. Unlike the capital costs of the system that increase as the cargo size increases, administrative costs decrease as the cargo size increases. This increase in the administrative costs for crate and pallet size UFTs is due to the need for more loading and offloading stations at terminals. This paper shows how the lifecycle cost of a proposed underground transportation system can be estimated using limited historical cost information.
    • Download: (419.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Lifecycle Cost Study of Underground Freight Transportation Systems in Texas

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249507
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    Show full item record

    contributor authorJanbaz Saeed;Shahandashti Mohsen;Najafi Mohammad;Tavakoli Razieh
    date accessioned2019-02-26T07:48:15Z
    date available2019-02-26T07:48:15Z
    date issued2018
    identifier other%28ASCE%29PS.1949-1204.0000322.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249507
    description abstractLifecycle cost analysis is a critical step in feasibility studies of future infrastructure projects. Lifecycle cost analysis of innovative infrastructure systems, such as a proposed underground freight transportation (UFT) is often challenging since there is not adequate historical cost information that is typically required for lifecycle cost analysis of these systems. The UFT system is a class of automated transportation systems in which vehicles carry freight through tunnels or pipelines under existing highways and roads between intermodal terminals. The objective of this paper is to assess the lifecycle cost of five UFT system alternatives in Texas. A stakeholder committee in conjunction with the Texas Department of Transportation (TxDOT) selected five alternatives: transporting shipping containers for 42.33 km (25 mi), 24.14 km (15 mi), and 6.43 km (4 mi); crate size cargoes for 24.14 km (15 mi); and pallet size cargoes for 24.14 km (15 mi). This analysis includes the capital and annual costs of a proposed UFT system in Texas over a lifecycle time of 1 years. The UFT system has major capital cost components including costs of tunnel construction, linear induction motors (LIMs), and vehicles. The annual cost components of the UFT system are the costs of maintenance, energy consumption, and administration. Historical tunneling costs are used to create a regression model to estimate costs of tunnels with various sizes. Quotes from the industry and RSMeans cost data are used to estimate the costs of vehicles, LIMs, UFT maintenance, energy consumption, and administration. The results of this paper inform transportation planners about lifecycle costs of the UFT system. Lifecycle costs of the UFT system include construction, maintenance, and operation costs. Unlike the capital costs of the system that increase as the cargo size increases, administrative costs decrease as the cargo size increases. This increase in the administrative costs for crate and pallet size UFTs is due to the need for more loading and offloading stations at terminals. This paper shows how the lifecycle cost of a proposed underground transportation system can be estimated using limited historical cost information.
    publisherAmerican Society of Civil Engineers
    titleLifecycle Cost Study of Underground Freight Transportation Systems in Texas
    typeJournal Paper
    journal volume9
    journal issue3
    journal titleJournal of Pipeline Systems Engineering and Practice
    identifier doi10.1061/(ASCE)PS.1949-1204.0000322
    page5018004
    treeJournal of Pipeline Systems Engineering and Practice:;2018:;Volume ( 009 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian