YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Estimating Performance Time for Construction Projects

    Source: Journal of Management in Engineering:;2007:;Volume ( 023 ):;issue: 004
    Author:
    Greg J. Hoffman
    ,
    Alfred E. Thal Jr.
    ,
    Timothy S. Webb
    ,
    Jeffery D. Weir
    DOI: 10.1061/(ASCE)0742-597X(2007)23:4(193)
    Publisher: American Society of Civil Engineers
    Abstract: The prediction of performance time for construction projects is a problem of interest to both researchers and practitioners. This research seeks to gain insight into the significant factors impacting construction duration by developing a regression model. Data were collected for 856 facility projects completed between 1988 and 2004. These data were analyzed using Bromilow’s time-cost (BTC) model (1969) as well as multiple linear regression. The multiple linear regression model was found to provide the most acceptable prediction. As in the BTC model and previous research reported in the literature, a significant correlation was found to exist between cost and duration. However, several other factors were also identified that resulted in significantly lower than average construction durations. These include projects completed within certain management groupings, managed by a certain construction agent, and designed by in-house personnel.
    • Download: (302.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Estimating Performance Time for Construction Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42492
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorGreg J. Hoffman
    contributor authorAlfred E. Thal Jr.
    contributor authorTimothy S. Webb
    contributor authorJeffery D. Weir
    date accessioned2017-05-08T21:12:00Z
    date available2017-05-08T21:12:00Z
    date copyrightOctober 2007
    date issued2007
    identifier other%28asce%290742-597x%282007%2923%3A4%28193%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42492
    description abstractThe prediction of performance time for construction projects is a problem of interest to both researchers and practitioners. This research seeks to gain insight into the significant factors impacting construction duration by developing a regression model. Data were collected for 856 facility projects completed between 1988 and 2004. These data were analyzed using Bromilow’s time-cost (BTC) model (1969) as well as multiple linear regression. The multiple linear regression model was found to provide the most acceptable prediction. As in the BTC model and previous research reported in the literature, a significant correlation was found to exist between cost and duration. However, several other factors were also identified that resulted in significantly lower than average construction durations. These include projects completed within certain management groupings, managed by a certain construction agent, and designed by in-house personnel.
    publisherAmerican Society of Civil Engineers
    titleEstimating Performance Time for Construction Projects
    typeJournal Paper
    journal volume23
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2007)23:4(193)
    treeJournal of Management in Engineering:;2007:;Volume ( 023 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian