YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    Author:
    Ullah Fahim;Thaheem Muhammad Jamaluddin;Sepasgozar Samad M. E.;Forcada Nuria
    DOI: 10.1061/(ASCE)LA.1943-4170.0000280
    Publisher: American Society of Civil Engineers
    Abstract: The determination of the concession period (CP) in public–private partnership (PPP) infrastructure projects presents complexities to decision makers because various critical success factors (CSF) are involved which may be overlooked. This paper outlines a system dynamics (SD)-based approach to provide an in-depth understanding of CSFs that determines PPP projects’ CP and models them for localized use. The CSFs are obtained from published literature, duly vetted through a survey of 56 experts, and used to develop a quantitative and qualitative SD model, validated by simulating case studies of five infrastructure projects. A total of 59 concession-affecting CSFs are highlighted that are reduced and compared for localized infrastructure projects. The findings indicate that CP should be dynamic instead of fixed and static, and warrant an extension of the originally proposed concession in three cases and reduction in the remaining two. The decision-making implications of this study target the three key stakeholders: the public body through reduced financial risks, the private organization through increased confidence and reassessment of concession during project life, and the end user through nominal tolls.
    • Download: (362.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249181
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorUllah Fahim;Thaheem Muhammad Jamaluddin;Sepasgozar Samad M. E.;Forcada Nuria
    date accessioned2019-02-26T07:45:46Z
    date available2019-02-26T07:45:46Z
    date issued2018
    identifier other%28ASCE%29LA.1943-4170.0000280.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249181
    description abstractThe determination of the concession period (CP) in public–private partnership (PPP) infrastructure projects presents complexities to decision makers because various critical success factors (CSF) are involved which may be overlooked. This paper outlines a system dynamics (SD)-based approach to provide an in-depth understanding of CSFs that determines PPP projects’ CP and models them for localized use. The CSFs are obtained from published literature, duly vetted through a survey of 56 experts, and used to develop a quantitative and qualitative SD model, validated by simulating case studies of five infrastructure projects. A total of 59 concession-affecting CSFs are highlighted that are reduced and compared for localized infrastructure projects. The findings indicate that CP should be dynamic instead of fixed and static, and warrant an extension of the originally proposed concession in three cases and reduction in the remaining two. The decision-making implications of this study target the three key stakeholders: the public body through reduced financial risks, the private organization through increased confidence and reassessment of concession during project life, and the end user through nominal tolls.
    publisherAmerican Society of Civil Engineers
    titleSystem Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors
    typeJournal Paper
    journal volume10
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000280
    page4518022
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian