YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Improving Collaboration among Stakeholders in Green Building Projects: Role of Early Contractor Involvement

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    Author:
    Ferme Luke;Zuo Jian;Rameezdeen Raufdeen
    DOI: 10.1061/(ASCE)LA.1943-4170.0000278
    Publisher: American Society of Civil Engineers
    Abstract: It is well recognized that collaboration and mutual trust among project participants are essential in the delivery of green buildings. A procurement model is the structure that defines the contractual and functional relationships among project participants. Therefore, the procurement model selected for a green building should be able to enhance collaboration, nonadversarial relationships, and a dispute free environment for the project to achieve desired green credentials. However, little is known about the capabilities of current procurement models to support such an endeavor. It is unclear from extant literature which procurement method(s) would support collaboration and how this could be achieved. Whereas the need for early contractor involvement is highlighted in past studies as a means to enhance collaboration, there is not much information as to how that could facilitate the achievement of green credentials. To fill the knowledge gap, this research aims to examine the functional relationships among project participants involved in Australian Green Star rated building projects. The study explore how the much needed collaboration happens in these procurement methods through a questionnaire survey and case studies. The questionnaire survey was conducted among willing project participants of 37 Green Star projects implemented in Adelaide, South Australia. Based on the results, the two most favorable procurement methods that improve collaboration, namely design and construct (DC) and management contracting (MC), were selected for case studies. Semistructured interviews were conducted among nine project participants of these two case studies to elicit detailed information on collaborative mechanisms and the way green credentials were supported through the procurement method. Results showed that despite a drive from the industry for more collaborative approaches, 48% of Green Star projects have utilized the traditional procurement model which promotes adversarial relationships among project participants. In contrast, alternative models such as DC and MC received a positive response on their capability to promote collaboration. In these two methods, early contractor involvement helped not only the main contractor but also trade contractors to work directly with other stakeholders to ensure the achievement of green credentials. This study proposes a few practical measures to improve the management credits in the Green Star rating tool while providing recommendations to enhance construction professionals’ understanding of the benefits and limitations of the major procurement methods when applied to green building projects.
    • Download: (155.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Improving Collaboration among Stakeholders in Green Building Projects: Role of Early Contractor Involvement

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249180
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorFerme Luke;Zuo Jian;Rameezdeen Raufdeen
    date accessioned2019-02-26T07:45:46Z
    date available2019-02-26T07:45:46Z
    date issued2018
    identifier other%28ASCE%29LA.1943-4170.0000278.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249180
    description abstractIt is well recognized that collaboration and mutual trust among project participants are essential in the delivery of green buildings. A procurement model is the structure that defines the contractual and functional relationships among project participants. Therefore, the procurement model selected for a green building should be able to enhance collaboration, nonadversarial relationships, and a dispute free environment for the project to achieve desired green credentials. However, little is known about the capabilities of current procurement models to support such an endeavor. It is unclear from extant literature which procurement method(s) would support collaboration and how this could be achieved. Whereas the need for early contractor involvement is highlighted in past studies as a means to enhance collaboration, there is not much information as to how that could facilitate the achievement of green credentials. To fill the knowledge gap, this research aims to examine the functional relationships among project participants involved in Australian Green Star rated building projects. The study explore how the much needed collaboration happens in these procurement methods through a questionnaire survey and case studies. The questionnaire survey was conducted among willing project participants of 37 Green Star projects implemented in Adelaide, South Australia. Based on the results, the two most favorable procurement methods that improve collaboration, namely design and construct (DC) and management contracting (MC), were selected for case studies. Semistructured interviews were conducted among nine project participants of these two case studies to elicit detailed information on collaborative mechanisms and the way green credentials were supported through the procurement method. Results showed that despite a drive from the industry for more collaborative approaches, 48% of Green Star projects have utilized the traditional procurement model which promotes adversarial relationships among project participants. In contrast, alternative models such as DC and MC received a positive response on their capability to promote collaboration. In these two methods, early contractor involvement helped not only the main contractor but also trade contractors to work directly with other stakeholders to ensure the achievement of green credentials. This study proposes a few practical measures to improve the management credits in the Green Star rating tool while providing recommendations to enhance construction professionals’ understanding of the benefits and limitations of the major procurement methods when applied to green building projects.
    publisherAmerican Society of Civil Engineers
    titleImproving Collaboration among Stakeholders in Green Building Projects: Role of Early Contractor Involvement
    typeJournal Paper
    journal volume10
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000278
    page4518020
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian