YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    Author:
    Shrestha Pramen P.;Zeleke Haileab
    DOI: 10.1061/(ASCE)LA.1943-4170.0000271
    Publisher: American Society of Civil Engineers
    Abstract: Change orders are common problems in construction projects, and the effect of change orders on cost and schedule have been studied. However, few studies have considered the effect of change orders on cost and schedule overruns of school building renovation projects. This study analyzes data for 161 school building renovation projects, worth $1 billion, constructed in the Las Vegas Valley in southern Nevada. The results show that, on average, the change orders increased the project cost by 3.56% of the total contract cost for these projects and that three-fourths of the project cost growth was due to change orders. In addition, about 4% of these projects faced schedule overruns due to change orders. The study also finds that change orders related to unforeseen conditions (1.45%) and design (1.36%) were significantly more costly than were owner-initiated change orders (.75%). The results of statistical tests show that the percentage of change orders for projects that had schedule overruns (5.26%) was significantly higher than for projects that had no schedule overruns (2.51%). This study finds that unforeseen, owner-initiated, and design-related change orders significantly increased schedule overruns of these projects. In addition, the study finds that change orders increased as the size of the renovation projects increased over $5 million, contradictory to what is found for new construction projects. It is recommended that school district administrators control these change orders in order to minimize cost and schedule overruns on school building renovation projects.
    • Download: (260.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249177
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorShrestha Pramen P.;Zeleke Haileab
    date accessioned2019-02-26T07:45:45Z
    date available2019-02-26T07:45:45Z
    date issued2018
    identifier other%28ASCE%29LA.1943-4170.0000271.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249177
    description abstractChange orders are common problems in construction projects, and the effect of change orders on cost and schedule have been studied. However, few studies have considered the effect of change orders on cost and schedule overruns of school building renovation projects. This study analyzes data for 161 school building renovation projects, worth $1 billion, constructed in the Las Vegas Valley in southern Nevada. The results show that, on average, the change orders increased the project cost by 3.56% of the total contract cost for these projects and that three-fourths of the project cost growth was due to change orders. In addition, about 4% of these projects faced schedule overruns due to change orders. The study also finds that change orders related to unforeseen conditions (1.45%) and design (1.36%) were significantly more costly than were owner-initiated change orders (.75%). The results of statistical tests show that the percentage of change orders for projects that had schedule overruns (5.26%) was significantly higher than for projects that had no schedule overruns (2.51%). This study finds that unforeseen, owner-initiated, and design-related change orders significantly increased schedule overruns of these projects. In addition, the study finds that change orders increased as the size of the renovation projects increased over $5 million, contradictory to what is found for new construction projects. It is recommended that school district administrators control these change orders in order to minimize cost and schedule overruns on school building renovation projects.
    publisherAmerican Society of Civil Engineers
    titleEffect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects
    typeJournal Paper
    journal volume10
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000271
    page4518018
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian