YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Claims and Project Performance between Traditional and Alternative Project Delivery Methods

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 003
    Author:
    Hashem M. Mehany Mohammed S.;Bashettiyavar Gautham;Esmaeili Behzad;Gad Ghada
    DOI: 10.1061/(ASCE)LA.1943-4170.0000266
    Publisher: American Society of Civil Engineers
    Abstract: Claims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4–$12 billion per year. While previous studies have indicated that project delivery methods (PDMs) might impact the frequency and severity of claims and disputes in highway projects, none provided any empirical evidence to support this perception, especially as related to the claim types in different project delivery methods. To address this issue and explore the different variables that might affect claims and disputes among many other project performances metrics, this empirical study was initiated. Data were collected by distributing a questionnaire to DOTs across the transportation sector. The data were analyzed using descriptive and inferential statistics. Results showed that while PDMs, procurement, and contractual methods have no significant impact on the claim and dispute performance, PDMs can impact other factors (e.g., contractor’s performance and trust). These significant findings provide opportunities for further research in other areas such as trust and partnering, which were proven to strategically act as indirect mitigation practices on claim and dispute occurrence in construction projects. The study can also be used by practitioners to further understand the real reasons behind claims and disputes, avoid their triggers, and build a good model of trust for claim and dispute avoidance.
    • Download: (247.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Claims and Project Performance between Traditional and Alternative Project Delivery Methods

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249173
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorHashem M. Mehany Mohammed S.;Bashettiyavar Gautham;Esmaeili Behzad;Gad Ghada
    date accessioned2019-02-26T07:45:43Z
    date available2019-02-26T07:45:43Z
    date issued2018
    identifier other%28ASCE%29LA.1943-4170.0000266.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249173
    description abstractClaims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4–$12 billion per year. While previous studies have indicated that project delivery methods (PDMs) might impact the frequency and severity of claims and disputes in highway projects, none provided any empirical evidence to support this perception, especially as related to the claim types in different project delivery methods. To address this issue and explore the different variables that might affect claims and disputes among many other project performances metrics, this empirical study was initiated. Data were collected by distributing a questionnaire to DOTs across the transportation sector. The data were analyzed using descriptive and inferential statistics. Results showed that while PDMs, procurement, and contractual methods have no significant impact on the claim and dispute performance, PDMs can impact other factors (e.g., contractor’s performance and trust). These significant findings provide opportunities for further research in other areas such as trust and partnering, which were proven to strategically act as indirect mitigation practices on claim and dispute occurrence in construction projects. The study can also be used by practitioners to further understand the real reasons behind claims and disputes, avoid their triggers, and build a good model of trust for claim and dispute avoidance.
    publisherAmerican Society of Civil Engineers
    titleClaims and Project Performance between Traditional and Alternative Project Delivery Methods
    typeJournal Paper
    journal volume10
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000266
    page4518017
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian