YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Particularized Analysis of AIA’s Expeditious Mechanisms for Administering Claims and Disputes

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 003
    Author:
    Barakat Mohammad;Abdul-Malak Mohamed-Asem;Khoury Hiam
    DOI: 10.1061/(ASCE)LA.1943-4170.0000262
    Publisher: American Society of Civil Engineers
    Abstract: Contract conditions governing the administration of construction claims and disputes play a critical role concerning the efficiency and speed with which their resolutions can be concluded. Available standard conditions offer a variety of timeline spectrums along which the resolution of such claims and disputes can be pursued. A detailed analysis of the relevant stipulations offered by the latest standard conditions recently issued by the American Institute of Architects (AIA) is presented, with the goal of addressing their particular merits and the corresponding performance requirements expected of contract administration professionals acting on behalf of the parties to the construction contract. The methodology involved highlighting the properties that are conducive to expeditious administration of claims and disputes and pinpointing those other characteristics that may provide room for claims and disputes to undesirably drag beyond what is inherently implied by these conditions. Multiple findings are summarized along with numerous examined timeline aspects, including the significance of issuing an initial decision, the ability of triggering resolution closures, and the ability of enforcing settlements reached within mediation. Particularized timeline scenarios are constructed, along with a flow diagram embedding all possible claim/dispute tracking paths that are likely to evolve, which can be of crucial guidance to concerned practicing contract administrators.
    • Download: (2.318Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Particularized Analysis of AIA’s Expeditious Mechanisms for Administering Claims and Disputes

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4249170
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorBarakat Mohammad;Abdul-Malak Mohamed-Asem;Khoury Hiam
    date accessioned2019-02-26T07:45:42Z
    date available2019-02-26T07:45:42Z
    date issued2018
    identifier other%28ASCE%29LA.1943-4170.0000262.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249170
    description abstractContract conditions governing the administration of construction claims and disputes play a critical role concerning the efficiency and speed with which their resolutions can be concluded. Available standard conditions offer a variety of timeline spectrums along which the resolution of such claims and disputes can be pursued. A detailed analysis of the relevant stipulations offered by the latest standard conditions recently issued by the American Institute of Architects (AIA) is presented, with the goal of addressing their particular merits and the corresponding performance requirements expected of contract administration professionals acting on behalf of the parties to the construction contract. The methodology involved highlighting the properties that are conducive to expeditious administration of claims and disputes and pinpointing those other characteristics that may provide room for claims and disputes to undesirably drag beyond what is inherently implied by these conditions. Multiple findings are summarized along with numerous examined timeline aspects, including the significance of issuing an initial decision, the ability of triggering resolution closures, and the ability of enforcing settlements reached within mediation. Particularized timeline scenarios are constructed, along with a flow diagram embedding all possible claim/dispute tracking paths that are likely to evolve, which can be of crucial guidance to concerned practicing contract administrators.
    publisherAmerican Society of Civil Engineers
    titleParticularized Analysis of AIA’s Expeditious Mechanisms for Administering Claims and Disputes
    typeJournal Paper
    journal volume10
    journal issue3
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000262
    page4518015
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian