YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimized Building Component Assessment Planning Using a Value of Information Model

    Source: Journal of Performance of Constructed Facilities:;2018:;Volume ( 032 ):;issue: 004
    Author:
    Grussing Michael N.
    DOI: 10.1061/(ASCE)CF.1943-5509.0001198
    Publisher: American Society of Civil Engineers
    Abstract: Facility condition assessments are a key aspect of a proactive asset management approach, as they provide the information necessary to determine current conditions and work needs, as well as forecasting future conditions to identify long-range work planning requirements. While these assessments can provide a benefit to asset management decision making, they also require resources in terms of time, personnel, and funding. When these resources are finite, as they typically are in facility management, it is important to understand the value that an assessment can provide. Of particular interest to facility managers is determining the optimal time to inspect the components of a building to maximize this value. To achieve this, the paper presents a methodology to calculate the value that building component inspection information provides toward the work planning decision process. The methodology uses a value of information decision tree with a Markov component condition prediction model to calculate the probability of failure. This approach considers the time since the last inspection occurred, the expected condition state of the component, the risk consequence associated with failure, and the cost of risk mitigation related to proactive repair or replacement activities. Results of an applied case study indicate that there is indeed an optimal time since the last inspection that optimizes this value, allowing managers to better allocate scarce inspection resources using this model. In addition, varying inspection types with different levels of detail and accuracy can be analyzed, allowing for a selection of the best type of inspection to perform given the component life-cycle situation, in addition to the inspection frequency.
    • Download: (1.344Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Optimized Building Component Assessment Planning Using a Value of Information Model

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4248518
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorGrussing Michael N.
    date accessioned2019-02-26T07:39:14Z
    date available2019-02-26T07:39:14Z
    date issued2018
    identifier other%28ASCE%29CF.1943-5509.0001198.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248518
    description abstractFacility condition assessments are a key aspect of a proactive asset management approach, as they provide the information necessary to determine current conditions and work needs, as well as forecasting future conditions to identify long-range work planning requirements. While these assessments can provide a benefit to asset management decision making, they also require resources in terms of time, personnel, and funding. When these resources are finite, as they typically are in facility management, it is important to understand the value that an assessment can provide. Of particular interest to facility managers is determining the optimal time to inspect the components of a building to maximize this value. To achieve this, the paper presents a methodology to calculate the value that building component inspection information provides toward the work planning decision process. The methodology uses a value of information decision tree with a Markov component condition prediction model to calculate the probability of failure. This approach considers the time since the last inspection occurred, the expected condition state of the component, the risk consequence associated with failure, and the cost of risk mitigation related to proactive repair or replacement activities. Results of an applied case study indicate that there is indeed an optimal time since the last inspection that optimizes this value, allowing managers to better allocate scarce inspection resources using this model. In addition, varying inspection types with different levels of detail and accuracy can be analyzed, allowing for a selection of the best type of inspection to perform given the component life-cycle situation, in addition to the inspection frequency.
    publisherAmerican Society of Civil Engineers
    titleOptimized Building Component Assessment Planning Using a Value of Information Model
    typeJournal Paper
    journal volume32
    journal issue4
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0001198
    page4018054
    treeJournal of Performance of Constructed Facilities:;2018:;Volume ( 032 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian