YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluating the Operational Footprint of Alternative Diamond Interchanges

    Source: Journal of Transportation Engineering, Part A: Systems:;2018:;Volume ( 144 ):;issue: 009
    Author:
    Sultana Most Afia;Tarko Andrew;Romero Mario
    DOI: 10.1061/JTEPBS.0000166
    Publisher: American Society of Civil Engineers
    Abstract: Queue spillback onto the freeway mainlines and the interactions with the adjacent intersections can have adverse impacts on traffic operation and safety, whereby the freeway becomes an expensive substitute for storing vehicles when spillback is prevalent. Thus, queue spillback onto the freeway mainlines and adjacent intersections should be analyzed as an integral part of the preliminary design selection of the service interchange. Past studies produced valuable ideas for preventing queues from reaching freeway segments, and to a smaller extent, reaching the neighboring intersections on the crossing roads. The majority of the past research focused on nonstructural remedies that are useful for improving traffic operations on existing roads, but only a few of them provided results useful in the planning and design stages. The objective of the study was to investigate the operational footprints of alternative diamond interchanges by estimating the longest queues on off-ramps and crossing roads under various geometric and traffic conditions. Ten thousand simulations of six alternative diamond designs were conducted under various geometric and traffic conditions, providing results that can assist practitioners in informed decision making. The methodology can be implemented to other interchange and intersection forms to define the operational footprint and identify potential problems in the early stages of planning and design.
    • Download: (1.363Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Evaluating the Operational Footprint of Alternative Diamond Interchanges

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4248357
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorSultana Most Afia;Tarko Andrew;Romero Mario
    date accessioned2019-02-26T07:37:37Z
    date available2019-02-26T07:37:37Z
    date issued2018
    identifier otherJTEPBS.0000166.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248357
    description abstractQueue spillback onto the freeway mainlines and the interactions with the adjacent intersections can have adverse impacts on traffic operation and safety, whereby the freeway becomes an expensive substitute for storing vehicles when spillback is prevalent. Thus, queue spillback onto the freeway mainlines and adjacent intersections should be analyzed as an integral part of the preliminary design selection of the service interchange. Past studies produced valuable ideas for preventing queues from reaching freeway segments, and to a smaller extent, reaching the neighboring intersections on the crossing roads. The majority of the past research focused on nonstructural remedies that are useful for improving traffic operations on existing roads, but only a few of them provided results useful in the planning and design stages. The objective of the study was to investigate the operational footprints of alternative diamond interchanges by estimating the longest queues on off-ramps and crossing roads under various geometric and traffic conditions. Ten thousand simulations of six alternative diamond designs were conducted under various geometric and traffic conditions, providing results that can assist practitioners in informed decision making. The methodology can be implemented to other interchange and intersection forms to define the operational footprint and identify potential problems in the early stages of planning and design.
    publisherAmerican Society of Civil Engineers
    titleEvaluating the Operational Footprint of Alternative Diamond Interchanges
    typeJournal Paper
    journal volume144
    journal issue9
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/JTEPBS.0000166
    page4018043
    treeJournal of Transportation Engineering, Part A: Systems:;2018:;Volume ( 144 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian