YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluating the Influence of Differing Geotechnical Risk Perceptions on Design-Build Highway Projects

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2018:;Volume ( 004 ):;issue: 004
    Author:
    Castro-Nova I.;Gad G. M.;Touran A.;Cetin B.;Gransberg D. D.
    DOI: 10.1061/AJRUA6.0000993
    Publisher: American Society of Civil Engineers
    Abstract: Managing geotechnical risk in design-build (DB) projects is complicated because the contract is awarded before a thorough subsurface investigation is conducted, making geotechnical uncertainty high during bid preparation. Typically, owners allocate geotechnical risk between themselves and competing design-builders in the DB project’s request of proposals (RFP), and the perceived RFP risk profile is reflected in the bid prices proposed by competing DB teams. The level of perceived geotechnical uncertainty is exacerbated when the RFP’s geotechnical content is either inadequate or ambiguous, a condition that may not have been recognized by the RFP’s authors. Hence, the purpose of this paper is to understand the influence of differing perceptions on the DB project’s pricing. The paper analyzes the difference in perceived DB geotechnical risk for 27 common geotechnical risk factors identified in a survey of state department of transportation (DOT) geotechnical engineers and professionals of the DB industry. Those geotechnical risk factors were rated on the basis of frequency and impact by 46 DOT and industry practitioners, and the results are synthesized using importance index theory. The study finds a statistically significant difference in the perceptions of importance of geotechnical risk factors between public agencies and the DB industry. The average perceived difference in the rated factors is nearly 12%. This paper recommends that the perceptions of geotechnical risk be aligned before the contract award using progressive DB procurement or after the award using a scope validation period to provide an opportunity to share the geotechnical risks.
    • Download: (1.388Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Evaluating the Influence of Differing Geotechnical Risk Perceptions on Design-Build Highway Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4248233
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    Show full item record

    contributor authorCastro-Nova I.;Gad G. M.;Touran A.;Cetin B.;Gransberg D. D.
    date accessioned2019-02-26T07:36:35Z
    date available2019-02-26T07:36:35Z
    date issued2018
    identifier otherAJRUA6.0000993.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248233
    description abstractManaging geotechnical risk in design-build (DB) projects is complicated because the contract is awarded before a thorough subsurface investigation is conducted, making geotechnical uncertainty high during bid preparation. Typically, owners allocate geotechnical risk between themselves and competing design-builders in the DB project’s request of proposals (RFP), and the perceived RFP risk profile is reflected in the bid prices proposed by competing DB teams. The level of perceived geotechnical uncertainty is exacerbated when the RFP’s geotechnical content is either inadequate or ambiguous, a condition that may not have been recognized by the RFP’s authors. Hence, the purpose of this paper is to understand the influence of differing perceptions on the DB project’s pricing. The paper analyzes the difference in perceived DB geotechnical risk for 27 common geotechnical risk factors identified in a survey of state department of transportation (DOT) geotechnical engineers and professionals of the DB industry. Those geotechnical risk factors were rated on the basis of frequency and impact by 46 DOT and industry practitioners, and the results are synthesized using importance index theory. The study finds a statistically significant difference in the perceptions of importance of geotechnical risk factors between public agencies and the DB industry. The average perceived difference in the rated factors is nearly 12%. This paper recommends that the perceptions of geotechnical risk be aligned before the contract award using progressive DB procurement or after the award using a scope validation period to provide an opportunity to share the geotechnical risks.
    publisherAmerican Society of Civil Engineers
    titleEvaluating the Influence of Differing Geotechnical Risk Perceptions on Design-Build Highway Projects
    typeJournal Paper
    journal volume4
    journal issue4
    journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    identifier doi10.1061/AJRUA6.0000993
    page4018038
    treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering:;2018:;Volume ( 004 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian