YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Major Construction Delay Factors in Portugal, the UK, and the US

    Source: Practice Periodical on Structural Design and Construction:;2018:;Volume ( 023 ):;issue: 004
    Author:
    Choong Kog Yue
    DOI: 10.1061/(ASCE)SC.1943-5576.0000389
    Publisher: American Society of Civil Engineers
    Abstract: Construction delays are a common problem in all the developed and developing countries costing the industry billions of dollars every year. Understanding the major delay factors for construction projects is the first step to reduce this unnecessary loss. A combined 13 studies to identify the top delay factors for construction projects in Portugal, the UK, and the US have been reported in the literature. Thirty-five construction delay factors out of a possible 42 reported in the literature have been identified as one of the top 1 construction delay factors by one of the four or five studies for each of these countries. This means that some of the top construction delay factors may not be appropriate. It is confusing to practitioners in prioritizing appropriate preventive measures to achieve better schedule performance. A thorough review of these 13 studies is undertaken to identify the top 1 delay factors for construction projects in Portugal, the UK, and the US, respectively. With respect to the construction delay factors identified, preventive measures for each major delay factor to improve the schedule performance of construction projects in Portugal, the UK, and the US are presented. The level of improvement in the schedule performance of construction projects in Portugal, the UK, and the US will depend on the extent of the implementation of the recommended measures. Similar measures can be implemented in other countries with such major construction delay factors.
    • Download: (91.13Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Major Construction Delay Factors in Portugal, the UK, and the US

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4247917
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorChoong Kog Yue
    date accessioned2019-02-26T07:33:49Z
    date available2019-02-26T07:33:49Z
    date issued2018
    identifier other%28ASCE%29SC.1943-5576.0000389.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4247917
    description abstractConstruction delays are a common problem in all the developed and developing countries costing the industry billions of dollars every year. Understanding the major delay factors for construction projects is the first step to reduce this unnecessary loss. A combined 13 studies to identify the top delay factors for construction projects in Portugal, the UK, and the US have been reported in the literature. Thirty-five construction delay factors out of a possible 42 reported in the literature have been identified as one of the top 1 construction delay factors by one of the four or five studies for each of these countries. This means that some of the top construction delay factors may not be appropriate. It is confusing to practitioners in prioritizing appropriate preventive measures to achieve better schedule performance. A thorough review of these 13 studies is undertaken to identify the top 1 delay factors for construction projects in Portugal, the UK, and the US, respectively. With respect to the construction delay factors identified, preventive measures for each major delay factor to improve the schedule performance of construction projects in Portugal, the UK, and the US are presented. The level of improvement in the schedule performance of construction projects in Portugal, the UK, and the US will depend on the extent of the implementation of the recommended measures. Similar measures can be implemented in other countries with such major construction delay factors.
    publisherAmerican Society of Civil Engineers
    titleMajor Construction Delay Factors in Portugal, the UK, and the US
    typeJournal Paper
    journal volume23
    journal issue4
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000389
    page4018024
    treePractice Periodical on Structural Design and Construction:;2018:;Volume ( 023 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian