| contributor author | Khalied Hyari | |
| contributor author | Khaled El-Rayes | |
| date accessioned | 2017-05-08T21:11:55Z | |
| date available | 2017-05-08T21:11:55Z | |
| date copyright | January 2006 | |
| date issued | 2006 | |
| identifier other | %28asce%290742-597x%282006%2922%3A1%2811%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/42441 | |
| description abstract | This paper presents a multiobjective optimization model for the planning and scheduling of repetitive construction projects. The model enables construction planners to generate and evaluate optimal construction plans that minimize project duration and maximize crew work continuity, simultaneously. The computations in the present model are organized in three major modules: scheduling, optimization, and ranking modules. First, the scheduling module uses a resource-driven scheduling algorithm to develop practical schedules for repetitive construction projects. Second, the optimization module utilizes multiobjective genetic algorithms to search for and identify feasible construction plans that establish optimal tradeoffs between project duration and crew work continuity. Third, the ranking module uses multiattribute utility theory to rank the generated plans in order to facilitate the selection and execution of the best overall plan for the project being considered. An application example is analyzed to illustrate the use of the model demonstrate its new capabilities in optimizing the planning and scheduling of repetitive construction projects. | |
| publisher | American Society of Civil Engineers | |
| title | Optimal Planning and Scheduling for Repetitive Construction Projects | |
| type | Journal Paper | |
| journal volume | 22 | |
| journal issue | 1 | |
| journal title | Journal of Management in Engineering | |
| identifier doi | 10.1061/(ASCE)0742-597X(2006)22:1(11) | |
| tree | Journal of Management in Engineering:;2006:;Volume ( 022 ):;issue: 001 | |
| contenttype | Fulltext | |