YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Modeling the Construction Risk Ratings to Estimate the Contingency in Highway Projects

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    Author:
    Mohamed F. Diab
    ,
    Amiy Varma
    ,
    Kamalesh Panthi
    DOI: 10.1061/(ASCE)CO.1943-7862.0001334
    Publisher: American Society of Civil Engineers
    Abstract: Past studies have highlighted the importance of risk assessment in construction projects and have recommended different ways to respond to potential risks that may develop over the different phases of the project. One of the strategies to respond to risk is through the proper allocation of contingency amounts. The purpose of this research paper is to assess perceived ratings of cost and schedule impact, and relative importance of the identified risk drivers on cost contingency amounts. The preidentified risk drivers were evaluated using survey responses from professionals in the context of highway transportation projects. The stepwise regression modeling was used to analyze the dependency relationship between predetermined cost contingency amounts in these projects and the perceived ratings of risk drivers assessed by project professionals. The study found that inadequate constructability reviews had a significant influence on determining owner’s contingency, whereas changes by owner’s request impacted both the owner’s and the contractor’s contingency amount, and also had a significant impact on a project schedule. The models developed and the methodology used in developing these models could be used in the planning phase of similar highway construction projects to apportion risk-appropriate contingency percentage.
    • Download: (339.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Modeling the Construction Risk Ratings to Estimate the Contingency in Highway Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4241189
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohamed F. Diab
    contributor authorAmiy Varma
    contributor authorKamalesh Panthi
    date accessioned2017-12-16T09:18:21Z
    date available2017-12-16T09:18:21Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001334.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241189
    description abstractPast studies have highlighted the importance of risk assessment in construction projects and have recommended different ways to respond to potential risks that may develop over the different phases of the project. One of the strategies to respond to risk is through the proper allocation of contingency amounts. The purpose of this research paper is to assess perceived ratings of cost and schedule impact, and relative importance of the identified risk drivers on cost contingency amounts. The preidentified risk drivers were evaluated using survey responses from professionals in the context of highway transportation projects. The stepwise regression modeling was used to analyze the dependency relationship between predetermined cost contingency amounts in these projects and the perceived ratings of risk drivers assessed by project professionals. The study found that inadequate constructability reviews had a significant influence on determining owner’s contingency, whereas changes by owner’s request impacted both the owner’s and the contractor’s contingency amount, and also had a significant impact on a project schedule. The models developed and the methodology used in developing these models could be used in the planning phase of similar highway construction projects to apportion risk-appropriate contingency percentage.
    publisherAmerican Society of Civil Engineers
    titleModeling the Construction Risk Ratings to Estimate the Contingency in Highway Projects
    typeJournal Paper
    journal volume143
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001334
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian