YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Statistical Model for Schedule Prediction: Validation in a Housing-Cooperative Construction Database

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 011
    Author:
    N. Rudeli
    ,
    A. Santilli
    ,
    I. Puente
    ,
    E. Viles
    DOI: 10.1061/(ASCE)CO.1943-7862.0001396
    Publisher: American Society of Civil Engineers
    Abstract: There are often considerable differences between the planned schedule for a construction project and what later develops during actual construction. This paper introduces an innovative approach that uses Markov Chain models to support predictions during earned value analyses. A statistical model was developed to predict possible deviations in a project schedule and the future progress of a project. This model, based on Markov chains, uses data from the past to adjust future predictions. A case study was built from a database of 90 housing cooperative construction projects and was validated in 12 more projects. A cross validation of three interactions was also carried out, obtaining an error of 2.38% in the prediction of future progress and an error of 4.29% in the prediction of construction timing. The innovative prediction model presented in this paper contributes to the management body of knowledge by introducing a new tool for the management and control of construction timing. The method presented improves construction management because it predicts future deviations in schedules with reduced errors and determines total deviation from a construction schedule with great precision. This allows better control over work timing and represents important input in determining strategies and future actions.
    • Download: (253.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Statistical Model for Schedule Prediction: Validation in a Housing-Cooperative Construction Database

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4241133
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorN. Rudeli
    contributor authorA. Santilli
    contributor authorI. Puente
    contributor authorE. Viles
    date accessioned2017-12-16T09:18:08Z
    date available2017-12-16T09:18:08Z
    date issued2017
    identifier other%28ASCE%29CO.1943-7862.0001396.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4241133
    description abstractThere are often considerable differences between the planned schedule for a construction project and what later develops during actual construction. This paper introduces an innovative approach that uses Markov Chain models to support predictions during earned value analyses. A statistical model was developed to predict possible deviations in a project schedule and the future progress of a project. This model, based on Markov chains, uses data from the past to adjust future predictions. A case study was built from a database of 90 housing cooperative construction projects and was validated in 12 more projects. A cross validation of three interactions was also carried out, obtaining an error of 2.38% in the prediction of future progress and an error of 4.29% in the prediction of construction timing. The innovative prediction model presented in this paper contributes to the management body of knowledge by introducing a new tool for the management and control of construction timing. The method presented improves construction management because it predicts future deviations in schedules with reduced errors and determines total deviation from a construction schedule with great precision. This allows better control over work timing and represents important input in determining strategies and future actions.
    publisherAmerican Society of Civil Engineers
    titleStatistical Model for Schedule Prediction: Validation in a Housing-Cooperative Construction Database
    typeJournal Paper
    journal volume143
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001396
    treeJournal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian