YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Review of the Effectiveness of Arbitration

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2017:;Volume ( 009 ):;issue: 001
    Author:
    Amit Moza
    ,
    Virendra Kumar Paul
    DOI: 10.1061/(ASCE)LA.1943-4170.0000204
    Publisher: American Society of Civil Engineers
    Abstract: Disputes are common and unavoidable in any construction project. These must be resolved in a timely manner lest they adversely affect time and cost aspects of the project and even affect its economic viability. Arbitration has been used as a means of dispute resolution as it is considered to be a speedier and more cost-effective way of conflict resolution than litigation. However, the arbitration process has often been marred by delays leading to time and cost escalation, thereby failing to meet the very purpose of relevant legislation. With the construction sector undertaking more complex projects, disputes will require an efficient redressal mechanism. The present study has been undertaken to understand and evaluate the effectiveness of the current arbitration procedure in India, specifically those under the public sector. An assessment has been done to determine its adequacy to meet the complexities and challenges of the contemporary construction sector. A total of 22 cases of arbitration from the Central Public Works Department (CPWD) have been considered for the present study. Total times for arbitration and durations between various stages of arbitration have been captured to bring out the fact that arbitration takes longer than desired. The study reveals that appointment of arbitrators and frequent changes in arbitrators are the main reasons for delays in the arbitration process. In addition, submission of claims and counterclaims coupled with an increased number of hearings also result in delays in overall process of arbitration. Recommendations that can assist in speeding up the settlement of issues are proposed on the basis of this limited study.
    • Download: (1.018Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Review of the Effectiveness of Arbitration

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/4238395
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorAmit Moza
    contributor authorVirendra Kumar Paul
    date accessioned2017-12-16T09:05:30Z
    date available2017-12-16T09:05:30Z
    date issued2017
    identifier other%28ASCE%29LA.1943-4170.0000204.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4238395
    description abstractDisputes are common and unavoidable in any construction project. These must be resolved in a timely manner lest they adversely affect time and cost aspects of the project and even affect its economic viability. Arbitration has been used as a means of dispute resolution as it is considered to be a speedier and more cost-effective way of conflict resolution than litigation. However, the arbitration process has often been marred by delays leading to time and cost escalation, thereby failing to meet the very purpose of relevant legislation. With the construction sector undertaking more complex projects, disputes will require an efficient redressal mechanism. The present study has been undertaken to understand and evaluate the effectiveness of the current arbitration procedure in India, specifically those under the public sector. An assessment has been done to determine its adequacy to meet the complexities and challenges of the contemporary construction sector. A total of 22 cases of arbitration from the Central Public Works Department (CPWD) have been considered for the present study. Total times for arbitration and durations between various stages of arbitration have been captured to bring out the fact that arbitration takes longer than desired. The study reveals that appointment of arbitrators and frequent changes in arbitrators are the main reasons for delays in the arbitration process. In addition, submission of claims and counterclaims coupled with an increased number of hearings also result in delays in overall process of arbitration. Recommendations that can assist in speeding up the settlement of issues are proposed on the basis of this limited study.
    publisherAmerican Society of Civil Engineers
    titleReview of the Effectiveness of Arbitration
    typeJournal Paper
    journal volume9
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000204
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2017:;Volume ( 009 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian