YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Baseline Determination in Construction Labor Productivity-Loss Claims

    Source: Journal of Management in Engineering:;2003:;Volume ( 019 ):;issue: 004
    Author:
    Ronald Gulezian
    ,
    Frederic Samelian
    DOI: 10.1061/(ASCE)0742-597X(2003)19:4(160)
    Publisher: American Society of Civil Engineers
    Abstract: Various ways of quantifying damages have been applied to productivity loss claims in construction. All of the ways attempt to be as objective as possible based on the extent of information available in a particular case. The measured mile, a widely accepted method, is employed when an unimpacted baseline period of production can be identified. Although that approach is considered to be the most objective method available in such cases, the method is limited and does not directly account for variation in individual productivity values about a normal or natural level of productivity. A gap exists between the use of existing methods and the availability of an appropriate methodology that specifically addresses variation in productivity. The key lies in the way baseline productivity is measured, which is inherently statistical, yet no truly statistical methods are used to establish such a baseline. Using the measured mile as a backdrop, this article provides an objective, measurement-based approach that can be used to establish a productivity baseline applied to construction productivity loss claims, based on the application of statistical methods aided by a process control chart. The focus is on providing the basic principles and concepts underlying the approach presented.
    • Download: (67.30Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Baseline Determination in Construction Labor Productivity-Loss Claims

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42382
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorRonald Gulezian
    contributor authorFrederic Samelian
    date accessioned2017-05-08T21:11:49Z
    date available2017-05-08T21:11:49Z
    date copyrightOctober 2003
    date issued2003
    identifier other%28asce%290742-597x%282003%2919%3A4%28160%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42382
    description abstractVarious ways of quantifying damages have been applied to productivity loss claims in construction. All of the ways attempt to be as objective as possible based on the extent of information available in a particular case. The measured mile, a widely accepted method, is employed when an unimpacted baseline period of production can be identified. Although that approach is considered to be the most objective method available in such cases, the method is limited and does not directly account for variation in individual productivity values about a normal or natural level of productivity. A gap exists between the use of existing methods and the availability of an appropriate methodology that specifically addresses variation in productivity. The key lies in the way baseline productivity is measured, which is inherently statistical, yet no truly statistical methods are used to establish such a baseline. Using the measured mile as a backdrop, this article provides an objective, measurement-based approach that can be used to establish a productivity baseline applied to construction productivity loss claims, based on the application of statistical methods aided by a process control chart. The focus is on providing the basic principles and concepts underlying the approach presented.
    publisherAmerican Society of Civil Engineers
    titleBaseline Determination in Construction Labor Productivity-Loss Claims
    typeJournal Paper
    journal volume19
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2003)19:4(160)
    treeJournal of Management in Engineering:;2003:;Volume ( 019 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian