YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Conflicts between Owner and Contractors: Proposed Intervention Process

    Source: Journal of Management in Engineering:;2003:;Volume ( 019 ):;issue: 003
    Author:
    Kathleen M. J. Harmon
    DOI: 10.1061/(ASCE)0742-597X(2003)19:3(121)
    Publisher: American Society of Civil Engineers
    Abstract: The parties of a construction contract, the owner and contractor, are a society with a complex set of interrelated relationships requiring cooperation and collaboration to coordinate time, resources, and communication. The main goal of the parties involved in a project’s construction is to have a successful project constructed in accordance with the plans and specifications, within the time and cost originally anticipated. The success of a project depends on a number of variables, not the least of which is how the organizations approach problems and conflicts. However, the adversarial atmosphere that infects the industry can prevent the parties from reaching their goal. This paper proposes an intervention process, a combination of partnership and mediation, to prevent and resolve dispute prior to contract close-out.
    • Download: (44.23Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Conflicts between Owner and Contractors: Proposed Intervention Process

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42376
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKathleen M. J. Harmon
    date accessioned2017-05-08T21:11:49Z
    date available2017-05-08T21:11:49Z
    date copyrightJuly 2003
    date issued2003
    identifier other%28asce%290742-597x%282003%2919%3A3%28121%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42376
    description abstractThe parties of a construction contract, the owner and contractor, are a society with a complex set of interrelated relationships requiring cooperation and collaboration to coordinate time, resources, and communication. The main goal of the parties involved in a project’s construction is to have a successful project constructed in accordance with the plans and specifications, within the time and cost originally anticipated. The success of a project depends on a number of variables, not the least of which is how the organizations approach problems and conflicts. However, the adversarial atmosphere that infects the industry can prevent the parties from reaching their goal. This paper proposes an intervention process, a combination of partnership and mediation, to prevent and resolve dispute prior to contract close-out.
    publisherAmerican Society of Civil Engineers
    titleConflicts between Owner and Contractors: Proposed Intervention Process
    typeJournal Paper
    journal volume19
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2003)19:3(121)
    treeJournal of Management in Engineering:;2003:;Volume ( 019 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian