YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Maintainability Implemented by Third-Party Contractor for Public Owner

    Source: Journal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 002
    Author:
    Blia Moua Her
    ,
    Jeffrey S. Russell
    DOI: 10.1061/(ASCE)0742-597X(2002)18:2(95)
    Publisher: American Society of Civil Engineers
    Abstract: This case study presents an overview of a well-defined corporate maintainability program that is implemented by a third-party contractor for facilities at a National Aeronautics and Space Administration (NASA) site. The third-party contractor is a full-service organization providing design, construction, operations, and maintenance service through a design/build/maintain/operate contract. As the owner, NASA provides guidelines for the maintainability program, which the third-party contractor implements at the project level. This case study chronicles the actions taken by the owner and contractor in implementing maintainability at the corporate and project levels. The structure of this case study follows the six milestones of the Construction Industry Institute model process for maintainability implementation.
    • Download: (902.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Maintainability Implemented by Third-Party Contractor for Public Owner

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42345
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorBlia Moua Her
    contributor authorJeffrey S. Russell
    date accessioned2017-05-08T21:11:46Z
    date available2017-05-08T21:11:46Z
    date copyrightApril 2002
    date issued2002
    identifier other%28asce%290742-597x%282002%2918%3A2%2895%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42345
    description abstractThis case study presents an overview of a well-defined corporate maintainability program that is implemented by a third-party contractor for facilities at a National Aeronautics and Space Administration (NASA) site. The third-party contractor is a full-service organization providing design, construction, operations, and maintenance service through a design/build/maintain/operate contract. As the owner, NASA provides guidelines for the maintainability program, which the third-party contractor implements at the project level. This case study chronicles the actions taken by the owner and contractor in implementing maintainability at the corporate and project levels. The structure of this case study follows the six milestones of the Construction Industry Institute model process for maintainability implementation.
    publisherAmerican Society of Civil Engineers
    titleMaintainability Implemented by Third-Party Contractor for Public Owner
    typeJournal Paper
    journal volume18
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2002)18:2(95)
    treeJournal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian