YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Beyond ‘Six Sigma’

    Source: Journal of Management in Engineering:;2000:;Volume ( 016 ):;issue: 004
    Author:
    Frederick D. Buggie
    DOI: 10.1061/(ASCE)0742-597X(2000)16:4(28)
    Publisher: American Society of Civil Engineers
    Abstract: If your firm has reached its optimum production cycle but you need work done better and faster. What do you do? You might try a fresh perspective. Most approaches to increasing productivity, including six sigma, aim at improving current processes, concentrating on reducing an operation's average cycle time and eliminating any defects, errors, or scrap in the process. Eventually, however, a process reaches a point where it can no longer be improved. This article shows how to look beyond your traditional processes to find better, more productive ones by using experts from a variety of fields outside your own and developing these ideas into something that give you even better performance.
    • Download: (71.74Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Beyond ‘Six Sigma’

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/42270
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorFrederick D. Buggie
    date accessioned2017-05-08T21:11:40Z
    date available2017-05-08T21:11:40Z
    date copyrightJuly 2000
    date issued2000
    identifier other%28asce%290742-597x%282000%2916%3A4%2828%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42270
    description abstractIf your firm has reached its optimum production cycle but you need work done better and faster. What do you do? You might try a fresh perspective. Most approaches to increasing productivity, including six sigma, aim at improving current processes, concentrating on reducing an operation's average cycle time and eliminating any defects, errors, or scrap in the process. Eventually, however, a process reaches a point where it can no longer be improved. This article shows how to look beyond your traditional processes to find better, more productive ones by using experts from a variety of fields outside your own and developing these ideas into something that give you even better performance.
    publisherAmerican Society of Civil Engineers
    titleBeyond ‘Six Sigma’
    typeJournal Paper
    journal volume16
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2000)16:4(28)
    treeJournal of Management in Engineering:;2000:;Volume ( 016 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian