YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Bucking the Trend: Cost-Plus Services in Lump-Sum Turnkey Market

    Source: Journal of Management in Engineering:;1997:;Volume ( 013 ):;issue: 001
    Author:
    H. Fred Smith
    DOI: 10.1061/(ASCE)0742-597X(1997)13:1(38)
    Publisher: American Society of Civil Engineers
    Abstract: Engineering, procurement, construction, and startup of cogeneration plants in the United States has evolved into a set pattern of lump-sum turnkey performance by engineering contractors and major equipment vendors. This method of designing, constructing, and starting up cogeneration plants has been driven by the requirements of project financing and long-term, nonrecourse funding. Design and construction of plants in Canada, though, has tended to be performed on a cost-plus basis, despite pressures from its southern neighbor. This paper reviews the results from the cost-plus contracting of three of Canada's first cogeneration plants. It also examines the contracting strategy used by the nonregulated division of a major Canadian electrical utility to acquire engineering, procurement, and construction management (EPCM) and startup (SU) services for two subsequent cogeneration plants—one in Ontario and one in Quebec—both on a reimbursable-cost basis. It explains why this owner felt the “cost-plus” approach was most cost effective (despite considerable “lump sum” pressure); discusses the controls that were implemented during the bidding and contractor interviewing stages to harness potential “cost-plus” engineering mentalities; and reveals some of the results from contractor proposals and interviews.
    • Download: (694.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Bucking the Trend: Cost-Plus Services in Lump-Sum Turnkey Market

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/41979
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorH. Fred Smith
    date accessioned2017-05-08T21:11:13Z
    date available2017-05-08T21:11:13Z
    date copyrightJanuary 1997
    date issued1997
    identifier other%28asce%290742-597x%281997%2913%3A1%2838%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41979
    description abstractEngineering, procurement, construction, and startup of cogeneration plants in the United States has evolved into a set pattern of lump-sum turnkey performance by engineering contractors and major equipment vendors. This method of designing, constructing, and starting up cogeneration plants has been driven by the requirements of project financing and long-term, nonrecourse funding. Design and construction of plants in Canada, though, has tended to be performed on a cost-plus basis, despite pressures from its southern neighbor. This paper reviews the results from the cost-plus contracting of three of Canada's first cogeneration plants. It also examines the contracting strategy used by the nonregulated division of a major Canadian electrical utility to acquire engineering, procurement, and construction management (EPCM) and startup (SU) services for two subsequent cogeneration plants—one in Ontario and one in Quebec—both on a reimbursable-cost basis. It explains why this owner felt the “cost-plus” approach was most cost effective (despite considerable “lump sum” pressure); discusses the controls that were implemented during the bidding and contractor interviewing stages to harness potential “cost-plus” engineering mentalities; and reveals some of the results from contractor proposals and interviews.
    publisherAmerican Society of Civil Engineers
    titleBucking the Trend: Cost-Plus Services in Lump-Sum Turnkey Market
    typeJournal Paper
    journal volume13
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1997)13:1(38)
    treeJournal of Management in Engineering:;1997:;Volume ( 013 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian