YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Twinning Time and Cost in Incentive-Based Contracts

    Source: Journal of Management in Engineering:;1996:;Volume ( 012 ):;issue: 004
    Author:
    A. Jaafari
    DOI: 10.1061/(ASCE)0742-597X(1996)12:4(62)
    Publisher: American Society of Civil Engineers
    Abstract: The work presented in this paper focuses on contractual management of projects using a unique risk-management–driven strategy in which the twin variables of time and cost play a fundamental role. To illustrate the conceptual basis of this technique, an example project is presented first. Through the application of the writer's methodology to this project it has been shown how an incentive scheme could be set as the main contractual strategy with significant potential savings in both time and cost. The mean and 90% characteristic value for construction duration and cost, respectively, are estimated by the owner first using the writer's probabilistic forecasting method. These are used to specify an incentive scheme within which the two primary risk variables of time and cost are managed jointly by the owner and the contractor. Contractual issues such as owner's tender strategy, contractor's risk assessment, scope variation, and rise and fall adjustment have also been considered briefly.
    • Download: (1.309Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Twinning Time and Cost in Incentive-Based Contracts

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/41926
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorA. Jaafari
    date accessioned2017-05-08T21:11:09Z
    date available2017-05-08T21:11:09Z
    date copyrightJuly 1996
    date issued1996
    identifier other%28asce%290742-597x%281996%2912%3A4%2862%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41926
    description abstractThe work presented in this paper focuses on contractual management of projects using a unique risk-management–driven strategy in which the twin variables of time and cost play a fundamental role. To illustrate the conceptual basis of this technique, an example project is presented first. Through the application of the writer's methodology to this project it has been shown how an incentive scheme could be set as the main contractual strategy with significant potential savings in both time and cost. The mean and 90% characteristic value for construction duration and cost, respectively, are estimated by the owner first using the writer's probabilistic forecasting method. These are used to specify an incentive scheme within which the two primary risk variables of time and cost are managed jointly by the owner and the contractor. Contractual issues such as owner's tender strategy, contractor's risk assessment, scope variation, and rise and fall adjustment have also been considered briefly.
    publisherAmerican Society of Civil Engineers
    titleTwinning Time and Cost in Incentive-Based Contracts
    typeJournal Paper
    journal volume12
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1996)12:4(62)
    treeJournal of Management in Engineering:;1996:;Volume ( 012 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian