YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assessment of Work Performance of Maintenance Contractors in Saudi Arabia

    Source: Journal of Management in Engineering:;1996:;Volume ( 012 ):;issue: 002
    Author:
    Abdul-mohsen Al-Hammad
    ,
    Sadi Assaf
    DOI: 10.1061/(ASCE)0742-597X(1996)12:2(44)
    Publisher: American Society of Civil Engineers
    Abstract: In Saudi Arabia as well as in other countries, building owners often differ in their approach to evaluating the work performance of their maintenance contractors. To unify the approach for such evaluation, the intent of this paper is to assess the evaluation approaches used by a variety of building owners and then focus on the main criteria used for the evaluation. To achieve this objective, this study is divided into two phases. The first phase includes a review of literature on the main criteria that can be used to evaluate maintenance contracts, followed by interviews with building owners and maintenance contractors to modify and update the criteria obtained from this review. The result of this phase is grouped into eight major categories. Each category involves a detailed list of the criteria used for the evaluation. The main categories include providing proper planning and scheduling; procuring materials for the site; providing suggestions on cost cutting; providing safety precautions at the building site; subcontracting control; and ensuring management efficiency, equipment availability, and man-power competence. The second phase consists of developing and then distributing a questionnaire for both building owners and maintenance contractors to rank the importance of each one of the detailed criteria indicated in the first phase of the study. The results of this survey indicate the significance of the criteria that should be used to evaluate contractors. Furthermore, the study indicates that owners and maintenance contractors generally agree on the ranking of the importance of the performance criteria.
    • Download: (640.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Assessment of Work Performance of Maintenance Contractors in Saudi Arabia

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/41889
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAbdul-mohsen Al-Hammad
    contributor authorSadi Assaf
    date accessioned2017-05-08T21:11:04Z
    date available2017-05-08T21:11:04Z
    date copyrightMarch 1996
    date issued1996
    identifier other%28asce%290742-597x%281996%2912%3A2%2844%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41889
    description abstractIn Saudi Arabia as well as in other countries, building owners often differ in their approach to evaluating the work performance of their maintenance contractors. To unify the approach for such evaluation, the intent of this paper is to assess the evaluation approaches used by a variety of building owners and then focus on the main criteria used for the evaluation. To achieve this objective, this study is divided into two phases. The first phase includes a review of literature on the main criteria that can be used to evaluate maintenance contracts, followed by interviews with building owners and maintenance contractors to modify and update the criteria obtained from this review. The result of this phase is grouped into eight major categories. Each category involves a detailed list of the criteria used for the evaluation. The main categories include providing proper planning and scheduling; procuring materials for the site; providing suggestions on cost cutting; providing safety precautions at the building site; subcontracting control; and ensuring management efficiency, equipment availability, and man-power competence. The second phase consists of developing and then distributing a questionnaire for both building owners and maintenance contractors to rank the importance of each one of the detailed criteria indicated in the first phase of the study. The results of this survey indicate the significance of the criteria that should be used to evaluate contractors. Furthermore, the study indicates that owners and maintenance contractors generally agree on the ranking of the importance of the performance criteria.
    publisherAmerican Society of Civil Engineers
    titleAssessment of Work Performance of Maintenance Contractors in Saudi Arabia
    typeJournal Paper
    journal volume12
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1996)12:2(44)
    treeJournal of Management in Engineering:;1996:;Volume ( 012 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian