YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Fast Track Pros and Cons: Considerations for Industrial Projects

    Source: Journal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 005
    Author:
    Gareth Vaughan Williams
    DOI: 10.1061/(ASCE)0742-597X(1995)11:5(24)
    Publisher: American Society of Civil Engineers
    Abstract: Several years ago Tom Peters produced a video discussing the benefits of reducing durations. He talked about how Motorola was able to reduce the time it took to build a beeper from 40 days down to 2 or 3 days. He went on to talk about how this was the wave of the future and how this would be the savior of American business. We in the business of building industrial facilities passed it off as another fad. We were already building facilities as fast as we could. We could not improve our times significantly. These numbers Peters described, of reducing times by 50%, 60%, or 70%, were a pipe dream, at least in our business. Or were they? After recently completing a fast-track project of our own we learned some valuable lessons. We learned what is attainable, what it takes, and what it will take to do this kind of project on a more routine basis.
    • Download: (1.304Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Fast Track Pros and Cons: Considerations for Industrial Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/41844
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorGareth Vaughan Williams
    date accessioned2017-05-08T21:11:00Z
    date available2017-05-08T21:11:00Z
    date copyrightSeptember 1995
    date issued1995
    identifier other%28asce%290742-597x%281995%2911%3A5%2824%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41844
    description abstractSeveral years ago Tom Peters produced a video discussing the benefits of reducing durations. He talked about how Motorola was able to reduce the time it took to build a beeper from 40 days down to 2 or 3 days. He went on to talk about how this was the wave of the future and how this would be the savior of American business. We in the business of building industrial facilities passed it off as another fad. We were already building facilities as fast as we could. We could not improve our times significantly. These numbers Peters described, of reducing times by 50%, 60%, or 70%, were a pipe dream, at least in our business. Or were they? After recently completing a fast-track project of our own we learned some valuable lessons. We learned what is attainable, what it takes, and what it will take to do this kind of project on a more routine basis.
    publisherAmerican Society of Civil Engineers
    titleFast Track Pros and Cons: Considerations for Industrial Projects
    typeJournal Paper
    journal volume11
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1995)11:5(24)
    treeJournal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian