YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Managing Design under Lump-Sum Contract

    Source: Journal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 002
    Author:
    Thomas J. Willoughby
    DOI: 10.1061/(ASCE)0742-597X(1995)11:2(21)
    Publisher: American Society of Civil Engineers
    Abstract: Managing design while under the constraints of a firm-price (lump-sum) contract with payment based on client-accepted deliverables provides the project manager a challenge that generally is not undertaken by the engineering profession. This paper defines the prerequisites for success with any design project. It amplifies management techniques that are required due to the nature of this contract type. Preestablishing a comprehensive list of deliverables that are time sensitive with a budget allocation that matches closely the anticipated expenditure curve is essential. Reaching mutual agreement between all participating parties, especially the client, on this deliverable list is a special challenge to a project manager's negotiation skills. Later in the paper, the writer uses a current project assignment as a testament to the identified prerequisites for success on a major tunnel project called the Point Loma Tunnel Outfall (PLTO). The lessons learned on this assignment can be applied to other contract forms. Regardless of contract type, having earned value assigned to the list of deliverables (a value expressed in either percentage, dollar, or hour) provides a measurement of contract scope. This technique provides better control of a project.
    • Download: (577.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Managing Design under Lump-Sum Contract

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/41813
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorThomas J. Willoughby
    date accessioned2017-05-08T21:10:56Z
    date available2017-05-08T21:10:56Z
    date copyrightMarch 1995
    date issued1995
    identifier other%28asce%290742-597x%281995%2911%3A2%2821%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41813
    description abstractManaging design while under the constraints of a firm-price (lump-sum) contract with payment based on client-accepted deliverables provides the project manager a challenge that generally is not undertaken by the engineering profession. This paper defines the prerequisites for success with any design project. It amplifies management techniques that are required due to the nature of this contract type. Preestablishing a comprehensive list of deliverables that are time sensitive with a budget allocation that matches closely the anticipated expenditure curve is essential. Reaching mutual agreement between all participating parties, especially the client, on this deliverable list is a special challenge to a project manager's negotiation skills. Later in the paper, the writer uses a current project assignment as a testament to the identified prerequisites for success on a major tunnel project called the Point Loma Tunnel Outfall (PLTO). The lessons learned on this assignment can be applied to other contract forms. Regardless of contract type, having earned value assigned to the list of deliverables (a value expressed in either percentage, dollar, or hour) provides a measurement of contract scope. This technique provides better control of a project.
    publisherAmerican Society of Civil Engineers
    titleManaging Design under Lump-Sum Contract
    typeJournal Paper
    journal volume11
    journal issue2
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1995)11:2(21)
    treeJournal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian