YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Waterway, Port, Coastal, and Ocean Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Waterway, Port, Coastal, and Ocean Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Use of Grout‐Filled Sausages in Coastal Structures

    Source: Journal of Waterway, Port, Coastal, and Ocean Engineering:;1986:;Volume ( 112 ):;issue: 001
    Author:
    Richard Silvester
    DOI: 10.1061/(ASCE)0733-950X(1986)112:1(95)
    Publisher: American Society of Civil Engineers
    Abstract: An alternative to rubble mound construction, with or without precast concrete armor units, is recommended which comprises flexible membranes filled with cement mortar in situ. The placement of these for greatest stability is suggested by maximizing surface contact of sausage type units. Results of tests to derive an economical mortar mix are described. Construction details are outlined together with comparative costs for a marina breakwater.
    • Download: (1.089Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Use of Grout‐Filled Sausages in Coastal Structures

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/40516
    Collections
    • Journal of Waterway, Port, Coastal, and Ocean Engineering

    Show full item record

    contributor authorRichard Silvester
    date accessioned2017-05-08T21:09:00Z
    date available2017-05-08T21:09:00Z
    date copyrightJanuary 1986
    date issued1986
    identifier other%28asce%290733-950x%281986%29112%3A1%2895%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/40516
    description abstractAn alternative to rubble mound construction, with or without precast concrete armor units, is recommended which comprises flexible membranes filled with cement mortar in situ. The placement of these for greatest stability is suggested by maximizing surface contact of sausage type units. Results of tests to derive an economical mortar mix are described. Construction details are outlined together with comparative costs for a marina breakwater.
    publisherAmerican Society of Civil Engineers
    titleUse of Grout‐Filled Sausages in Coastal Structures
    typeJournal Paper
    journal volume112
    journal issue1
    journal titleJournal of Waterway, Port, Coastal, and Ocean Engineering
    identifier doi10.1061/(ASCE)0733-950X(1986)112:1(95)
    treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1986:;Volume ( 112 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian