YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Extended OWA Operator for Group Decision Making on Water Resources Projects

    Source: Journal of Water Resources Planning and Management:;2008:;Volume ( 134 ):;issue: 003
    Author:
    M. Zarghami
    ,
    R. Ardakanian
    ,
    A. Memariani
    ,
    F. Szidarovszky
    DOI: 10.1061/(ASCE)0733-9496(2008)134:3(266)
    Publisher: American Society of Civil Engineers
    Abstract: Six water authorities share the Sefidrud watershed in the northwestern region of Iran and resolving the conflict among them is one of the major challenges of the water division of the government. In this paper a group decision support system will be developed for identifying the criteria and their weights, needed for ranking water resource projects in this watershed. This model will be based on extending the ordered weighted averaging (OWA) as an aggregation operator. The order weights of this operator will be determined first by using the minimal variability method. Second, a new measure will be developed to quantify consensus among the stakeholders. It guides the supervisor of the group decision making problem to negotiate with stakeholders effectively in the conflict resolution process. Using extended OWA, 13 water resources projects in the Sefidrud watershed will be ranked. A simulation study will also be reported, where the dependence of the optimal decision on the uncertainty level is examined. In addition, a new sensitivity analysis model will be introduced for the combined goodness measures of the projects with respect to the optimistic degree of the supervisor. A new composite measure of goodness will also be defined to obtain reliable solutions.
    • Download: (488.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Extended OWA Operator for Group Decision Making on Water Resources Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/40154
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorM. Zarghami
    contributor authorR. Ardakanian
    contributor authorA. Memariani
    contributor authorF. Szidarovszky
    date accessioned2017-05-08T21:08:21Z
    date available2017-05-08T21:08:21Z
    date copyrightMay 2008
    date issued2008
    identifier other%28asce%290733-9496%282008%29134%3A3%28266%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/40154
    description abstractSix water authorities share the Sefidrud watershed in the northwestern region of Iran and resolving the conflict among them is one of the major challenges of the water division of the government. In this paper a group decision support system will be developed for identifying the criteria and their weights, needed for ranking water resource projects in this watershed. This model will be based on extending the ordered weighted averaging (OWA) as an aggregation operator. The order weights of this operator will be determined first by using the minimal variability method. Second, a new measure will be developed to quantify consensus among the stakeholders. It guides the supervisor of the group decision making problem to negotiate with stakeholders effectively in the conflict resolution process. Using extended OWA, 13 water resources projects in the Sefidrud watershed will be ranked. A simulation study will also be reported, where the dependence of the optimal decision on the uncertainty level is examined. In addition, a new sensitivity analysis model will be introduced for the combined goodness measures of the projects with respect to the optimistic degree of the supervisor. A new composite measure of goodness will also be defined to obtain reliable solutions.
    publisherAmerican Society of Civil Engineers
    titleExtended OWA Operator for Group Decision Making on Water Resources Projects
    typeJournal Paper
    journal volume134
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(2008)134:3(266)
    treeJournal of Water Resources Planning and Management:;2008:;Volume ( 134 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian