YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimal Pump Scheduling in Water Supply Systems with Maximum Demand Charges

    Source: Journal of Water Resources Planning and Management:;2003:;Volume ( 129 ):;issue: 005
    Author:
    G. McCormick
    ,
    R. S. Powell
    DOI: 10.1061/(ASCE)0733-9496(2003)129:5(372)
    Publisher: American Society of Civil Engineers
    Abstract: The calculation of optimized pump schedules is sometimes complicated by the inclusion of a maximum demand charge in the electricity tariff. Maximum demand charges can be as much as 35% of energy costs, and in the United Kingdom they usually apply over a calendar month. In this paper, medium term maximum demand policies are assumed to be represented in daily scheduling by constraints on power use or by penalty costs. Derivation of optimal constraints or penalty costs has been formulated as a stochastic dynamic program in which variations in daily demand for water are modeled as a Markov process, and solved for the case where there is a single maximum demand charge for the system under consideration. A hypothetical case is provided to illustrate the process, and cost functions and optimal constraints for this case are presented graphically. The method has considerable advantages over heuristic techniques because it takes full account of uncertainty in the demand for water, and of the recursive nature of the problem.
    • Download: (288.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Optimal Pump Scheduling in Water Supply Systems with Maximum Demand Charges

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/39844
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorG. McCormick
    contributor authorR. S. Powell
    date accessioned2017-05-08T21:07:53Z
    date available2017-05-08T21:07:53Z
    date copyrightSeptember 2003
    date issued2003
    identifier other%28asce%290733-9496%282003%29129%3A5%28372%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39844
    description abstractThe calculation of optimized pump schedules is sometimes complicated by the inclusion of a maximum demand charge in the electricity tariff. Maximum demand charges can be as much as 35% of energy costs, and in the United Kingdom they usually apply over a calendar month. In this paper, medium term maximum demand policies are assumed to be represented in daily scheduling by constraints on power use or by penalty costs. Derivation of optimal constraints or penalty costs has been formulated as a stochastic dynamic program in which variations in daily demand for water are modeled as a Markov process, and solved for the case where there is a single maximum demand charge for the system under consideration. A hypothetical case is provided to illustrate the process, and cost functions and optimal constraints for this case are presented graphically. The method has considerable advantages over heuristic techniques because it takes full account of uncertainty in the demand for water, and of the recursive nature of the problem.
    publisherAmerican Society of Civil Engineers
    titleOptimal Pump Scheduling in Water Supply Systems with Maximum Demand Charges
    typeJournal Paper
    journal volume129
    journal issue5
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(2003)129:5(372)
    treeJournal of Water Resources Planning and Management:;2003:;Volume ( 129 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian