YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Benefit‐Cost Ratios: Failures and Alternatives

    Source: Journal of Water Resources Planning and Management:;1992:;Volume ( 118 ):;issue: 001
    Author:
    Jay R. Lund
    DOI: 10.1061/(ASCE)0733-9496(1992)118:1(94)
    Publisher: American Society of Civil Engineers
    Abstract: Despite decades of criticism, the benefit-cost ratio remains one of the most common measures of performance employed in economic evaluation of engineering projects. This paper reviews the problems inherent in this measure of economic performance and suggests alternative measures in its place. It is shown that there are many common circumstances in which the benefit-cost ratio is an unrealiable indicator of a design's economic desirability and comparative economic performance. These problems result largely from the economically arbitrary nature of most classifications of benefits and costs. The ratio measure should be dropped from all serious economic-evaluation manuals and protocols. Some alternative measures are discussed.
    • Download: (447.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Benefit‐Cost Ratios: Failures and Alternatives

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/39141
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorJay R. Lund
    date accessioned2017-05-08T21:06:46Z
    date available2017-05-08T21:06:46Z
    date copyrightJanuary 1992
    date issued1992
    identifier other%28asce%290733-9496%281992%29118%3A1%2894%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39141
    description abstractDespite decades of criticism, the benefit-cost ratio remains one of the most common measures of performance employed in economic evaluation of engineering projects. This paper reviews the problems inherent in this measure of economic performance and suggests alternative measures in its place. It is shown that there are many common circumstances in which the benefit-cost ratio is an unrealiable indicator of a design's economic desirability and comparative economic performance. These problems result largely from the economically arbitrary nature of most classifications of benefits and costs. The ratio measure should be dropped from all serious economic-evaluation manuals and protocols. Some alternative measures are discussed.
    publisherAmerican Society of Civil Engineers
    titleBenefit‐Cost Ratios: Failures and Alternatives
    typeJournal Paper
    journal volume118
    journal issue1
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1992)118:1(94)
    treeJournal of Water Resources Planning and Management:;1992:;Volume ( 118 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian