| contributor author | Slobodan P. Simonovic | |
| contributor author | Ljubisa M. Miloradov | |
| date accessioned | 2017-05-08T21:06:21Z | |
| date available | 2017-05-08T21:06:21Z | |
| date copyright | January 1988 | |
| date issued | 1988 | |
| identifier other | %28asce%290733-9496%281988%29114%3A1%28101%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/38876 | |
| description abstract | This paper presents the solution of the very specific problem of potential hydroenergy production in the North Backa hydrosystem (Yugoslavia). The system was designed for supplying water to agricultural areas by pumping water from the River Tisza on the higher elevation and transferring it to the Rivers Cik and Krivaja. An optimization analysis was done for the purpose of examining the possible hydroenergy production aiming at reducing the costs of pumping. | |
| publisher | American Society of Civil Engineers | |
| title | Potential Hydroenergy Production by Optimization | |
| type | Journal Paper | |
| journal volume | 114 | |
| journal issue | 1 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)0733-9496(1988)114:1(101) | |
| tree | Journal of Water Resources Planning and Management:;1988:;Volume ( 114 ):;issue: 001 | |
| contenttype | Fulltext | |