| contributor author | R. B. Allen | |
| contributor author | S. G. Bridgeman | |
| date accessioned | 2017-05-08T21:06:15Z | |
| date available | 2017-05-08T21:06:15Z | |
| date copyright | July 1986 | |
| date issued | 1986 | |
| identifier other | %28asce%290733-9496%281986%29112%3A3%28339%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/38785 | |
| description abstract | A dynamic programming optimization technique has been applied to three case studies involving hydropower scheduling. Each involved the analysis of an operating strategy for a different time perspective, i.e., instantaneous, hourly, and monthly time frames. The case studies included: (1) The optimal instantaneous scheduling of hydropower units, with different generating characteristics to maximize overall plant efficiency; (2) the optimal hourly scheduling of hydropower generation between two hydrologically linked power plants to maximize overall daily/weekly system efficiency; (3) the optimal monthly scheduling of hydropower generation to minimize the purchase cost of imported power supply subject to a time‐of‐day rate structure. The case studies have shown that optimization techniques can be successfully implemented to gain insight into complex operating strategies. | |
| publisher | American Society of Civil Engineers | |
| title | Dynamic Programming in Hydropower Scheduling | |
| type | Journal Paper | |
| journal volume | 112 | |
| journal issue | 3 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)0733-9496(1986)112:3(339) | |
| tree | Journal of Water Resources Planning and Management:;1986:;Volume ( 112 ):;issue: 003 | |
| contenttype | Fulltext | |