YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Development of a Flood Management Plan

    Source: Journal of Water Resources Planning and Management:;1985:;Volume ( 111 ):;issue: 004
    Author:
    Duncan W. Wqod
    ,
    Thomas C. Gooch
    ,
    Paul M. Pronovost
    ,
    David C. Noonan
    DOI: 10.1061/(ASCE)0733-9496(1985)111:4(417)
    Publisher: American Society of Civil Engineers
    Abstract: A comprehensive flood plain management plan was developed for the City of Keene, New Hampshire, reflecting the policies of Section 73 of Public Law 93‐251. Community attitudes were investigated through questionnaires, interviews with community leaders, and interaction with a community advisory committee. A full range of available nonstructural and structural flood damage reduction measures was surveyed. An initial set of measures was selected based on physical, economic, and political feasibility in Keene given the existing stream conditions, available stage‐damage estimates and community attitudes. These initial measures were evaluated in detail, and three alternative flood plain management plans were developed and analyzed using benefit‐cost and environmental assessment procedures. The recommended flood plain management plan for Keene included: (1) A technical assistance program to aid homeowners with flood‐proofing; (2) small dikes to protect selected structures or groups of structures from flooding; (3) channel improvements at constrictions; (4) enhancement of existing storage by restoration and modification of a damaged dam; and (5) development of a flood warning and emergency preparedness system. (6) The experience in Keene represents a prototype study implementing the requirements of Section 73 and can serve as a useful model for future nonstructural flood plain management studies.
    • Download: (993.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Development of a Flood Management Plan

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/38748
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorDuncan W. Wqod
    contributor authorThomas C. Gooch
    contributor authorPaul M. Pronovost
    contributor authorDavid C. Noonan
    date accessioned2017-05-08T21:06:10Z
    date available2017-05-08T21:06:10Z
    date copyrightSeptember 1985
    date issued1985
    identifier other%28asce%290733-9496%281985%29111%3A4%28417%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38748
    description abstractA comprehensive flood plain management plan was developed for the City of Keene, New Hampshire, reflecting the policies of Section 73 of Public Law 93‐251. Community attitudes were investigated through questionnaires, interviews with community leaders, and interaction with a community advisory committee. A full range of available nonstructural and structural flood damage reduction measures was surveyed. An initial set of measures was selected based on physical, economic, and political feasibility in Keene given the existing stream conditions, available stage‐damage estimates and community attitudes. These initial measures were evaluated in detail, and three alternative flood plain management plans were developed and analyzed using benefit‐cost and environmental assessment procedures. The recommended flood plain management plan for Keene included: (1) A technical assistance program to aid homeowners with flood‐proofing; (2) small dikes to protect selected structures or groups of structures from flooding; (3) channel improvements at constrictions; (4) enhancement of existing storage by restoration and modification of a damaged dam; and (5) development of a flood warning and emergency preparedness system. (6) The experience in Keene represents a prototype study implementing the requirements of Section 73 and can serve as a useful model for future nonstructural flood plain management studies.
    publisherAmerican Society of Civil Engineers
    titleDevelopment of a Flood Management Plan
    typeJournal Paper
    journal volume111
    journal issue4
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1985)111:4(417)
    treeJournal of Water Resources Planning and Management:;1985:;Volume ( 111 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian