| contributor author | Blair Orr | |
| contributor author | Charles H. Coole | |
| contributor author | Glade M. Sowards | |
| date accessioned | 2017-05-08T21:03:56Z | |
| date available | 2017-05-08T21:03:56Z | |
| date copyright | May 2000 | |
| date issued | 2000 | |
| identifier other | %28asce%290733-947x%282000%29126%3A3%28279%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/37272 | |
| description abstract | Cost data and bridge property data were collected for 121 timber bridges constructed as demonstration projects and for 206 timber bridges that were not demonstration projects. After controlling for selected structural and regional independent variables, demonstration bridge superstructures were approximately $120 per square meter more expensive than nondemonstration bridge superstructures. | |
| publisher | American Society of Civil Engineers | |
| title | Costs of Demonstration Projects: A Study of Timber Bridge Construction | |
| type | Journal Paper | |
| journal volume | 126 | |
| journal issue | 3 | |
| journal title | Journal of Transportation Engineering, Part A: Systems | |
| identifier doi | 10.1061/(ASCE)0733-947X(2000)126:3(279) | |
| tree | Journal of Transportation Engineering, Part A: Systems:;2000:;Volume ( 126 ):;issue: 003 | |
| contenttype | Fulltext | |