Show simple item record

contributor authorRaymond A. Krammes
contributor authorBlair G. Marsden
contributor authorConrad L. Dudek
date accessioned2017-05-08T21:02:18Z
date available2017-05-08T21:02:18Z
date copyrightJuly 1987
date issued1987
identifier other%28asce%290733-947x%281987%29113%3A4%28348%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/36326
description abstractPlanning and scheduling freeway maintenance and construction activities requires the consideration of tradeoffs between the efficiency of performing the work and the inconvenience to motorists traveling through the work zone. An easy‐to‐use microcomputer software package called QUEWZ‐85 has been developed to assist agencies in analyzing the impact on motorists. QUEWZ‐85 estimates the queue lengths and additional road‐user costs that would result from alternative work zone configurations and schedules. The methodology of the analytical model is summarized and the mechanics of using the software package are described. Several successful applications of the model are discussed. Recommendations for additional research to enhance the accuracy of the model are presented.
publisherAmerican Society of Civil Engineers
titleMicrocomputer Tool for Freeway Work Zone Planning and Scheduling
typeJournal Paper
journal volume113
journal issue4
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(1987)113:4(348)
treeJournal of Transportation Engineering, Part A: Systems:;1987:;Volume ( 113 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record