YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Predicting Costs of Pipe Cleaning and Lining Projects

    Source: Journal of Transportation Engineering, Part A: Systems:;1986:;Volume ( 112 ):;issue: 003
    Author:
    Thomas M. Walski
    DOI: 10.1061/(ASCE)0733-947X(1986)112:3(317)
    Publisher: American Society of Civil Engineers
    Abstract: Cleaning and cement‐mortar lining of water mains is the method of choice for many water utilities seeking to restore lost carrying capacity to their old pipes. In order to make good decisions concerning whether to clean and line a main, as opposed to replacing it, paralleling it, or leaving it alone, it is important to he able to quickly, yet accurately, estimate the costs of a cleaning and lining project. This paper gives a procedure for estimating the costs of cleaning and lining water mains. The costs predicted using the procedure described in this paper were compared with actual costs from 51 projects and were found to be within an average of 16% of the actual costs, even though a large variety of projects were considered.
    • Download: (609.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Predicting Costs of Pipe Cleaning and Lining Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/36261
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorThomas M. Walski
    date accessioned2017-05-08T21:02:11Z
    date available2017-05-08T21:02:11Z
    date copyrightMay 1986
    date issued1986
    identifier other%28asce%290733-947x%281986%29112%3A3%28317%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/36261
    description abstractCleaning and cement‐mortar lining of water mains is the method of choice for many water utilities seeking to restore lost carrying capacity to their old pipes. In order to make good decisions concerning whether to clean and line a main, as opposed to replacing it, paralleling it, or leaving it alone, it is important to he able to quickly, yet accurately, estimate the costs of a cleaning and lining project. This paper gives a procedure for estimating the costs of cleaning and lining water mains. The costs predicted using the procedure described in this paper were compared with actual costs from 51 projects and were found to be within an average of 16% of the actual costs, even though a large variety of projects were considered.
    publisherAmerican Society of Civil Engineers
    titlePredicting Costs of Pipe Cleaning and Lining Projects
    typeJournal Paper
    journal volume112
    journal issue3
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/(ASCE)0733-947X(1986)112:3(317)
    treeJournal of Transportation Engineering, Part A: Systems:;1986:;Volume ( 112 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian